IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

263

matching recommendations
Reset
SIC 3541 Machine Tools, Metal Cutting Types
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0295 # 03 Y:1994 03 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,077 $475 Implemented
MA0295 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $205 $0 Not Implemented
MA0295 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $123 $109 Not Implemented
WI0185 # 01 Y:1993 01 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,039 $0 Not Implemented
WI0185 # 02 Y:1993 02 1993 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,773 $0 Implemented
WI0185 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,604 $77,000 Not Implemented
WI0185 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,556 $2,336 Implemented
WI0185 # 05 Y:1993 05 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,295 $0 Implemented
WI0185 # 06 Y:1993 06 1993 INSTALL OCCUPANCY SENSORS $3,859 $900 Not Implemented
WI0185 # 07 Y:1993 07 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,407 $0 Not Implemented
WI0185 # 08 Y:1993 08 1993 RECOVER WASTE HEAT FROM EQUIPMENT $2,577 $1,200 Not Implemented
WI0185 # 09 Y:1993 09 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,819 $0 Not Implemented
WI0185 # 10 Y:1993 10 1993 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,596 $5,600 Not Implemented
WI0185 # 11 Y:1993 11 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,588 $5,000 Not Implemented
WI0185 # 12 Y:1993 12 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,112 $2,455 Not Implemented
AT0120 # 01 Y:1988 01 1988 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $17,222 $25,000 Implemented
AT0120 # 02 Y:1988 02 1988 KEEP LAMPS AND REFLECTORS CLEAN $2,621 $4,943 Not Implemented
AT0120 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $136 $300 Implemented
WI0023 # 01 Y:1988 01 1988 IMPROVE LUBRICATION PRACTICES $2,680 $0 Not Implemented
WI0023 # 02 Y:1988 02 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $327 $500 Implemented
WI0023 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $259 $163 Implemented
WI0023 # 04 Y:1988 04 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $716 $500 Implemented
WI0023 # 05 Y:1988 05 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $104 $0 Implemented
MA0059 # 01 Y:1986 01 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,336 $3,400 Implemented
MA0059 # 02 Y:1986 02 1986 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,030 $2,025 Not Implemented