IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

263

matching recommendations
Reset
SIC 3541 Machine Tools, Metal Cutting Types
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0083 # 01 Y:2011 01 2011 OPTIMIZE PLANT POWER FACTOR $9,142 $15,000 Implemented
MI0213 # 01 Y:2011 01 2011 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $5,935 $14,200 Not Implemented
MI0213 # 08 Y:2011 08 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $747 $900 Implemented
MI0213 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,260 $2,830 Not Implemented
MI0213 # 06 Y:2011 06 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,430 $1,860 Implemented
MI0213 # 05 Y:2011 05 2011 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,255 $350 Not Implemented
MI0213 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,184 $1,320 Not Implemented
MI0213 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,899 $4,000 Not Implemented
MI0213 # 02 Y:2011 02 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,640 $1,300 Implemented
TT0056 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,661 $45,225 Not Implemented
TT0056 # 03 Y:2010 03 2010 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,445 $1,444 Not Implemented
TT0056 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,872 $11,208 Not Implemented
TT0056 # 04 Y:2010 04 2010 INSTALL SKYLIGHTS $16,932 $88,000 Not Implemented
TT0056 # 05 Y:2010 05 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,966 $21,900 Not Implemented
MZ0038 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $840 $850 Implemented
MZ0038 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $408 $178 Not Implemented
MZ0038 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $600 $178 Implemented
MZ0038 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,616 $2,740 Implemented
MZ0038 # 05 Y:2009 05 2009 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,110 $4,200 Not Implemented
SD0372 # 07 Y:2005 07 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,147 $350 Not Implemented
SD0372 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,723 $16,563 Implemented
SD0372 # 09 Y:2005 09 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,612 $784 Not Implemented
SD0372 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,816 $2,580 Not Implemented
SD0372 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,173 $140 Implemented
SD0372 # 01 Y:2005 01 2005 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $11,522 $12,000 Not Implemented