IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 3541 Machine Tools, Metal Cutting Types
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0407 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,651 $2,474 Implemented
BD0407 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $2,441 $1,125 Not Implemented
BD0407 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,629 $10 Not Implemented
BD0407 # 05 Y:2012 05 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,259 $1,420 Not Implemented
BD0407 # 06 Y:2012 06 2012 USE PHOTOCELL CONTROLS $281 $300 Not Implemented
BD0407 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,152 $4,550 Implemented
WI0387 # 10 Y:2001 10 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $387 $90 Implemented
WI0387 # 09 Y:2001 09 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $630 $640 Implemented
WI0387 # 08 Y:2001 08 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,292 $0 Not Implemented
WI0387 # 07 Y:2001 07 2001 USE EVAPORATION TO CONCENTRATE MATERIAL $8,770 $16,000 Implemented
WI0387 # 06 Y:2001 06 2001 INSTALL OCCUPANCY SENSORS $418 $300 Implemented
WI0387 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $712 $2,050 Not Implemented
WI0387 # 04 Y:2001 04 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,726 $1,994 Implemented
WI0387 # 03 Y:2001 03 2001 INSTALL SPECTRAL REFLECTORS / DELAMP $9,794 $0 Implemented
WI0387 # 02 Y:2001 02 2001 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $24,138 $0 Implemented
WI0387 # 01 Y:2001 01 2001 IMPROVE SPACE COMFORT CONDITIONING $178,421 $400,000 n/a
WI0185 # 07 Y:1993 07 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,407 $0 Not Implemented
WI0185 # 01 Y:1993 01 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,039 $0 Not Implemented
WI0185 # 02 Y:1993 02 1993 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,773 $0 Implemented
WI0185 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,604 $77,000 Not Implemented
WI0185 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,556 $2,336 Implemented
WI0185 # 05 Y:1993 05 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,295 $0 Implemented
WI0185 # 12 Y:1993 12 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,112 $2,455 Not Implemented
WI0185 # 11 Y:1993 11 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,588 $5,000 Not Implemented
WI0185 # 10 Y:1993 10 1993 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,596 $5,600 Not Implemented