Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 2001 |
Principal Product | Machined Parts |
NAICS | n/a |
SIC | 3541 - Machine Tools, Metal Cutting Types |
Sales | $10,000,000-$50,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 67,000 |
Annual Production | 2,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $123,166 | 3,302,755 | kWh | $0.04 |
Electricity Demand | $73,562 | 5,986 | kW-months/year | $12.29 |
Electricity Fees | $13,237 | - | $ | - |
Natural Gas | $7,902 | 1,644 | MMBtu | $4.81 |
TOTAL ENERGY COSTS | $236,281 | |||
RECOMMENDED SAVINGS* | $229,288 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $48,863 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.424 IMPROVE SPACE COMFORT CONDITIONING |
Savings: $178,421 Cost: $400,000 |
- | - | - | - | - | - | - | - | - | - | $35,910 | - | $142,511 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$35,910 - $ |
$142,511 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION |
Savings: $24,138 Cost: - |
- | - | $39,888 | 2,182 | - | - | - | - | - | - | $(-15,750) | - | - | - |
- - kWh |
$39,888 2,182 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$(-15,750) - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $9,794 Cost: - |
$6,903 | 177,022 | $2,891 | 225 | - | - | - | - | - | - | - | - | - | - |
$6,903 177,022 kWh |
$2,891 225 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $4,726 Cost: $1,994 |
$2,591 | 66,530 | $2,135 | 166 | - | - | - | - | - | - | - | - | - | - |
$2,591 66,530 kWh |
$2,135 166 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $712 Cost: $2,050 |
$394 | 9,965 | $318 | 25 | - | - | - | - | - | - | - | - | - | - |
$394 9,965 kWh |
$318 25 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $418 Cost: $300 |
$418 | 10,551 | - | - | - | - | - | - | - | - | - | - | - | - |
$418 10,551 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $8,770 Cost: $16,000 |
- | - | - | - | $(-468) | (-97) | $12,738 | 9,844 | - | - | $(-3,500) | - | - | - |
- - kWh |
- - kW-months/year |
$(-468) (-97) MMBtu |
$12,738 9,844 gal |
- - lb |
$(-3,500) - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $1,292 Cost: - |
- | - | - | - | - | - | - | - | $1,292 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$1,292 - lb |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $630 Cost: $640 |
$422 | 10,844 | $208 | 16 | - | - | - | - | - | - | - | - | - | - |
$422 10,844 kWh |
$208 16 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $387 Cost: $90 |
$259 | 6,741 | $128 | 10 | - | - | - | - | - | - | - | - | - | - |
$259 6,741 kWh |
$128 10 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $229,288 Cost: $421,074 |
$10,987 | 281,653 | $45,568 | 2,624 | $(-468) | (-97) | $12,738 | 9,844 | $1,292 | - | $16,660 | - | $142,511 | - | $10,987 281,653 kWh |
$45,568 2,624 kW-months/year |
$(-468) (-97) MMBtu |
$12,738 9,844 gal |
$1,292 - lb |
$16,660 - $ |
$142,511 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $48,863 Cost: $19,024 |
$10,593 | 271,688 | $45,250 | 2,599 | $(-468) | (-97) | $12,738 | 9,844 | - | - | $(-19,250) | - | - | - | $10,593 271,688 kWh |
$45,250 2,599 kW-months/year |
$(-468) (-97) MMBtu |
$12,738 9,844 gal |
- - lb |
$(-19,250) - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Personnel Changes | Increase in Production |