Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
54
matching recommendationsSIC | 3542 | Machine Tools, Metal Forming Types |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0960 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,385 | $0 | Implemented |
UD0960 # 13 Y:2017 | 13 | 2017 | INSTALL OCCUPANCY SENSORS | $6,486 | $9,108 | Not Implemented |
UD0960 # 12 Y:2017 | 12 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,179 | $97,386 | Not Implemented |
UD0960 # 11 Y:2017 | 11 | 2017 | USE MINIMUM STEAM OPERATING PRESSURE | $826 | $0 | Not Implemented |
UD0960 # 10 Y:2017 | 10 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,121 | $0 | Not Implemented |
UD0960 # 09 Y:2017 | 09 | 2017 | REDUCE EXCESSIVE BOILER BLOWDOWN | $5,234 | $7,500 | Not Implemented |
UD0960 # 08 Y:2017 | 08 | 2017 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $11,351 | $10,000 | Not Implemented |
UD0960 # 06 Y:2017 | 06 | 2017 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $514 | $1,425 | Implemented |
UD0960 # 05 Y:2017 | 05 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $17,273 | $0 | Implemented |
UD0960 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,390 | $1,000 | Implemented |
UD0960 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,808 | $0 | Implemented |
UD0960 # 01 Y:2017 | 01 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,202 | $0 | Implemented |
UD0960 # 14 Y:2017 | 14 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,599 | $9,362 | Not Implemented |
UD0960 # 07 Y:2017 | 07 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,266 | $3,000 | Not Implemented |
WV0427 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,892 | $74,207 | Not Implemented |
WV0427 # 04 Y:2011 | 04 | 2011 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $6,867 | $637 | Implemented |
WV0427 # 03 Y:2011 | 03 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,998 | $3,390 | Not Implemented |
WV0427 # 02 Y:2011 | 02 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,712 | $42,275 | Not Implemented |
WV0427 # 08 Y:2011 | 08 | 2011 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,132 | $2,518 | Not Implemented |
WV0427 # 09 Y:2011 | 09 | 2011 | MODIFY STARTUP/SHUTDOWN TIMES | $3,115 | $975 | Implemented |
WV0427 # 10 Y:2011 | 10 | 2011 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $2,890 | $258 | Implemented |
WV0427 # 11 Y:2011 | 11 | 2011 | DIRECT WASTE GASSES TO BOILER COMBUSTION AIR | $2,312 | $11,063 | Not Implemented |
WV0427 # 12 Y:2011 | 12 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,161 | $955 | Not Implemented |
WV0427 # 13 Y:2011 | 13 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,509 | $5,031 | Not Implemented |
WV0427 # 07 Y:2011 | 07 | 2011 | INSTALL OCCUPANCY SENSORS | $4,250 | $1,260 | Not Implemented |