IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
SIC 3542 Machine Tools, Metal Forming Types
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0960 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,385 $0 Implemented
UD0960 # 13 Y:2017 13 2017 INSTALL OCCUPANCY SENSORS $6,486 $9,108 Not Implemented
UD0960 # 12 Y:2017 12 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,179 $97,386 Not Implemented
UD0960 # 11 Y:2017 11 2017 USE MINIMUM STEAM OPERATING PRESSURE $826 $0 Not Implemented
UD0960 # 10 Y:2017 10 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,121 $0 Not Implemented
UD0960 # 09 Y:2017 09 2017 REDUCE EXCESSIVE BOILER BLOWDOWN $5,234 $7,500 Not Implemented
UD0960 # 08 Y:2017 08 2017 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $11,351 $10,000 Not Implemented
UD0960 # 06 Y:2017 06 2017 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $514 $1,425 Implemented
UD0960 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $17,273 $0 Implemented
UD0960 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,390 $1,000 Implemented
UD0960 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $10,808 $0 Implemented
UD0960 # 01 Y:2017 01 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,202 $0 Implemented
UD0960 # 14 Y:2017 14 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,599 $9,362 Not Implemented
UD0960 # 07 Y:2017 07 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,266 $3,000 Not Implemented
WV0427 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,892 $74,207 Not Implemented
WV0427 # 04 Y:2011 04 2011 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $6,867 $637 Implemented
WV0427 # 03 Y:2011 03 2011 RECOVER WASTE HEAT FROM EQUIPMENT $8,998 $3,390 Not Implemented
WV0427 # 02 Y:2011 02 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,712 $42,275 Not Implemented
WV0427 # 08 Y:2011 08 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,132 $2,518 Not Implemented
WV0427 # 09 Y:2011 09 2011 MODIFY STARTUP/SHUTDOWN TIMES $3,115 $975 Implemented
WV0427 # 10 Y:2011 10 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,890 $258 Implemented
WV0427 # 11 Y:2011 11 2011 DIRECT WASTE GASSES TO BOILER COMBUSTION AIR $2,312 $11,063 Not Implemented
WV0427 # 12 Y:2011 12 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,161 $955 Not Implemented
WV0427 # 13 Y:2011 13 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,509 $5,031 Not Implemented
WV0427 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $4,250 $1,260 Not Implemented