IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

611

matching recommendations
Reset
SIC 3544 Special Dies, Tools, Jigs & Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0008 # 04 Y:2001 04 2001 RECOVER WASTE HEAT FROM EQUIPMENT $9,758 $1,463 Not Implemented
LM0008 # 05 Y:2001 05 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $36,000 $27,600 Implemented
LM0008 # 06 Y:2001 06 2001 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $146,432 $17,000 Implemented
LM0008 # 07 Y:2001 07 2001 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME $332,648 $0 Implemented
SF0212 # 01 Y:2001 01 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $847 $1,513 Implemented
SF0212 # 02 Y:2001 02 2001 INSTALL OCCUPANCY SENSORS $261 $600 Implemented
SF0212 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $422 $1,536 Not Implemented
SF0212 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $953 $4,666 Implemented
SF0212 # 05 Y:2001 05 2001 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $18,923 $15,000 Not Implemented
SD0251 # 01 Y:2000 01 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $9,187 $350 Not Implemented
SD0251 # 02 Y:2000 02 2000 INSULATE BARE EQUIPMENT $4,966 $664 Not Implemented
SD0251 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,693 $5,000 Not Implemented
SD0251 # 04 Y:2000 04 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,316 $5,000 Not Implemented
SD0251 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,040 $200 Implemented
SD0251 # 06 Y:2000 06 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,438 $1,438 Implemented
SD0251 # 07 Y:2000 07 2000 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $1,315 $1,000 Not Implemented
SD0251 # 08 Y:2000 08 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,240 $7,900 Implemented
SD0251 # 09 Y:2000 09 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $75,350 $10,050 Not Implemented
TP0013 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,107 $850 n/a
TP0013 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,419 $1,771 n/a
TP0013 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $2,151 $1,175 n/a
TP0013 # 04 Y:2000 04 2000 COMBINE UTILITY METERS $1,560 $0 n/a
TP0013 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $562 $1,492 n/a
TP0013 # 06 Y:2000 06 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $181 $67 n/a
TP0013 # 07 Y:2000 07 2000 ADD AREA LIGHTING SWITCHES $118 $0 n/a