Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
39
matching recommendationsSIC | 3544 | Special Dies, Tools, Jigs & Fixtures |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0150 # 02 Y:2002 | 02 | 2002 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,303 | $2,400 | Implemented |
LE0150 # 03 Y:2002 | 03 | 2002 | INSTALL TIMERS AND/OR THERMOSTATS | $2,256 | $1,050 | Implemented |
LE0150 # 01 Y:2002 | 01 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $642 | $500 | Implemented |
SU0144 # 06 Y:2002 | 06 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $586 | $0 | Not Implemented |
SU0144 # 09 Y:2002 | 09 | 2002 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $252 | $40 | Not Implemented |
SU0144 # 08 Y:2002 | 08 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $255 | $75 | Implemented |
SU0144 # 07 Y:2002 | 07 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $326 | $0 | Implemented |
SU0144 # 05 Y:2002 | 05 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $649 | $2,150 | Not Implemented |
SU0144 # 04 Y:2002 | 04 | 2002 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,289 | $1,344 | Not Implemented |
SU0144 # 03 Y:2002 | 03 | 2002 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,993 | $870 | Implemented |
SU0144 # 01 Y:2002 | 01 | 2002 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $6,266 | $12,159 | Not Implemented |
SU0144 # 02 Y:2002 | 02 | 2002 | INSULATE BARE EQUIPMENT | $3,865 | $181 | Implemented |
OK0645 # 06 Y:2002 | 06 | 2002 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $61,280 | $44,000 | Implemented |
OK0645 # 05 Y:2002 | 05 | 2002 | INSTALL OCCUPANCY SENSORS | $176 | $163 | Implemented |
OK0645 # 04 Y:2002 | 04 | 2002 | MOVE PRODUCT USING MECHANICAL MEANS | $22,600 | $10,000 | Not Implemented |
OK0645 # 03 Y:2002 | 03 | 2002 | MODIFY WORKLOAD | $10,443 | $5,600 | Not Implemented |
OK0645 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,887 | $220 | Implemented |
OK0645 # 01 Y:2002 | 01 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,346 | $2,900 | Not Implemented |
WV0238 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,250 | $315 | Implemented |
WV0238 # 05 Y:2002 | 05 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,894 | $2,910 | Implemented |
WV0238 # 06 Y:2002 | 06 | 2002 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,806 | $0 | Implemented |
WV0238 # 07 Y:2002 | 07 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $649 | $450 | Implemented |
WV0238 # 08 Y:2002 | 08 | 2002 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,813 | $0 | Implemented |
WV0238 # 09 Y:2002 | 09 | 2002 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $6,165 | $0 | Not Implemented |
WV0238 # 10 Y:2002 | 10 | 2002 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,562 | $150 | Implemented |