IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

424

matching recommendations
Reset
SIC 3545 Machine Tool Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0363 # 01 Y:1988 01 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,945 $200 Not Implemented
GT0363 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $380 $370 Not Implemented
GT0363 # 03 Y:1988 03 1988 AIR CONDITION ONLY SPACE NECESSARY $930 $840 Not Implemented
GT0363 # 04 Y:1988 04 1988 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $12,120 $4,685 Not Implemented
GT0363 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $472 $377 Not Implemented
GT0363 # 06 Y:1988 06 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $66,800 $45,607 Not Implemented
GT0363 # 07 Y:1988 07 1988 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $11,540 $32,000 Not Implemented
GT0363 # 08 Y:1988 08 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $163 $150 Not Implemented
UD0267 # 01 Y:1988 01 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,625 $0 Implemented
UD0267 # 02 Y:1988 02 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,250 $0 Not Implemented
UD0267 # 03 Y:1988 03 1988 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $10,439 $4,448 Implemented
UD0267 # 04 Y:1988 04 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,285 $552 Implemented
AM0037 # 01 Y:1988 01 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,390 $12,000 Implemented
AM0037 # 02 Y:1988 02 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,550 $1,000 Implemented
AM0037 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,881 $373 Implemented
AM0037 # 04 Y:1988 04 1988 INSTALL SET-BACK TIMERS $1,280 $0 Implemented
AM0037 # 05 Y:1988 05 1988 INSULATE BARE EQUIPMENT $860 $740 Implemented
AM0037 # 06 Y:1988 06 1988 IMPROVE LUBRICATION PRACTICES $370 $0 Implemented
AM0037 # 07 Y:1988 07 1988 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $68 $150 Not Implemented
AM0037 # 08 Y:1988 08 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $120 $100 Implemented
LT0052 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,660 $1,476 Implemented
LT0052 # 02 Y:1986 02 1986 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $3,370 $1,220 Not Implemented
LT0052 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,795 $4,990 Implemented
LT0052 # 04 Y:1986 04 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,659 $1,632 Implemented
LT0052 # 05 Y:1986 05 1986 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $735 $770 Not Implemented