IAC Assessment: GT0363
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0363
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1988
Principal Product DRILL BITS
NAICS n/a
SIC 3545 - Machine Tool Accessories
Sales $5,000,000-$10,000,000
# of Employees 550
Plant Area (Sq.Ft.) 0
Annual Production 750,000 Pounds
Production Hrs. Annual 7,488
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $843,651 16,826,495 kWh $0.05
Natural Gas $27,561 5,061 MMBtu $5.45
TOTAL ENERGY COSTS $871,212
RECOMMENDED SAVINGS* $95,350 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,945
Cost:
$200
$2,945 58,910 $2,945
58,910
kWh
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$380
Cost:
$370
$380 8,206 $380
8,206
kWh
03: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$930
Cost:
$840
$930 42,204 $930
42,204
kWh
04: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$12,120
Cost:
$4,685
$12,120 550,996 $12,120
550,996
kWh
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$472
Cost:
$377
$472 5,862 $472
5,862
kWh
06: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$66,800
Cost:
$45,607
$66,800 574,443 $66,800
574,443
kWh
07: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$11,540
Cost:
$32,000
$11,540 274,033 $11,540
274,033
kWh
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$163
Cost:
$150
$163 3,224 $163
3,224
kWh
TOTAL RECOMMENDED Savings:
$95,350
Cost:
$84,229
$95,350 1,517,878 $95,350
1,517,878
kWh
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - -
-
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage