IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 3545 Machine Tool Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0439 # 09 Y:2013 09 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $293 $300 Not Implemented
BD0439 # 01 Y:2013 01 2013 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $6,296 $50 Implemented
BD0439 # 02 Y:2013 02 2013 USE RADIANT HEATER FOR SPOT HEATING $4,775 $6,000 Not Implemented
BD0439 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $3,900 $1,000 Implemented
BD0439 # 04 Y:2013 04 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,797 $3,310 Not Implemented
BD0439 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $813 $795 Implemented
BD0439 # 06 Y:2013 06 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $535 $395 Not Implemented
BD0439 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $400 $20 Implemented
BD0439 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $341 $350 Implemented
BD0167 # 06 Y:2000 06 2000 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $273,586 $375,000 n/a
BD0167 # 05 Y:2000 05 2000 MINIMIZE WATER USAGE $328 $1,080 n/a
BD0167 # 04 Y:2000 04 2000 USE EVAPORATION TO CONCENTRATE MATERIAL $924 $3,400 n/a
BD0167 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $529 $600 n/a
BD0167 # 02 Y:2000 02 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $776 $1,750 n/a
BD0167 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,161 $500 n/a
BD0137 # 09 Y:1999 09 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $2,707 $10,000 Implemented
BD0137 # 11 Y:1999 11 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $11,480 $45,000 Not Implemented
BD0137 # 10 Y:1999 10 1999 MINIMIZE WATER USAGE $793 $1,540 Not Implemented
BD0137 # 08 Y:1999 08 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $662 $380 Not Implemented
BD0137 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,412 $4,890 Not Implemented
BD0137 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,871 $0 Not Implemented
BD0137 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,635 $225 Implemented
BD0137 # 04 Y:1999 04 1999 INSTALL OCCUPANCY SENSORS $1,559 $900 Not Implemented
BD0137 # 05 Y:1999 05 1999 USE SYNTHETIC LUBRICANT $1,173 $600 Not Implemented
BD0137 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $966 $969 Not Implemented