Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 1999 |
Principal Product | Machined Metal Products |
NAICS | n/a |
SIC | 3545 - Machine Tool Accessories |
Sales | $5,000,000-$10,000,000 |
# of Employees | 62 |
Plant Area (Sq.Ft.) | 36,000 |
Annual Production | 2,500,000 Pounds |
Production Hrs. Annual | 6,240 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $78,454 | 989,449 | kWh | $0.08 |
Natural Gas | $5,152 | 1,169 | MMBtu | $4.41 |
TOTAL ENERGY COSTS | $88,927 | |||
RECOMMENDED SAVINGS* | $27,993 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,342 |
#|Description |
Savings Cost |
Status | Electricity Usage | Water Disposal | Personnel Changes | Electricity Usage | Water Disposal | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $4,412 Cost: $4,890 |
$4,412 | 55,686 | - | - | - | - |
$4,412 55,686 kWh |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,871 Cost: - |
$1,871 | 23,740 | - | - | - | - |
$1,871 23,740 kWh |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,635 Cost: $225 |
$1,635 | 20,516 | - | - | - | - |
$1,635 20,516 kWh |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,559 Cost: $900 |
$1,559 | 19,637 | - | - | - | - |
$1,559 19,637 kWh |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $1,173 Cost: $600 |
$1,173 | 14,947 | - | - | - | - |
$1,173 14,947 kWh |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $966 Cost: $969 |
$966 | 12,309 | - | - | - | - |
$966 12,309 kWh |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $735 Cost: $500 |
$735 | 9,379 | - | - | - | - |
$735 9,379 kWh |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $662 Cost: $380 |
$662 | 8,499 | - | - | - | - |
$662 8,499 kWh |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $2,707 Cost: $10,000 |
$(-259) | (-3,224) | $3,366 | 510,008 | $(-400) | - |
$(-259) (-3,224) kWh |
$3,366 510,008 Tgal |
$(-400) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.4151 MINIMIZE WATER USAGE |
Savings: $793 Cost: $1,540 |
- | - | $793 | 120,120 | - | - |
- - kWh |
$793 120,120 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $11,480 Cost: $45,000 |
- | - | - | - | $11,480 | - |
- - kWh |
- - Tgal |
$11,480 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $27,993 Cost: $65,004 |
$12,754 | 161,489 | $4,159 | 630,128 | $11,080 | - | $12,754 161,489 kWh |
$4,159 630,128 Tgal |
$11,080 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,342 Cost: $10,225 |
$1,376 | 17,292 | $3,366 | 510,008 | $(-400) | - | $1,376 17,292 kWh |
$3,366 510,008 Tgal |
$(-400) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Water Disposal | Personnel Changes | Electricity Usage | Water Disposal | Personnel Changes |