Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsSIC | 3545 | Machine Tool Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ME0234 # 10 Y:1998 | 10 | 1998 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $1,114 | $7,000 | Implemented |
ME0234 # 09 Y:1998 | 09 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,887 | $3,000 | Not Implemented |
ME0234 # 08 Y:1998 | 08 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $150 | $0 | Not Implemented |
ME0234 # 07 Y:1998 | 07 | 1998 | RECOVER AND REUSE COOLING WATER | $12,512 | $12,000 | Implemented |
ME0234 # 06 Y:1998 | 06 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $975 | $500 | Implemented |
ME0234 # 05 Y:1998 | 05 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,284 | $800 | Implemented |
ME0234 # 04 Y:1998 | 04 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,482 | $4,476 | Implemented |
ME0234 # 03 Y:1998 | 03 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,153 | $10,580 | Implemented |
ME0234 # 02 Y:1998 | 02 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $19,979 | $12,932 | Implemented |
ME0234 # 01 Y:1998 | 01 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $38,400 | $50,000 | Implemented |
ME0103 # 07 Y:1993 | 07 | 1993 | PAY UTILITY BILLS ON TIME | $2,223 | $0 | Implemented |
ME0103 # 06 Y:1993 | 06 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $14,129 | $13,680 | Not Implemented |
ME0103 # 05 Y:1993 | 05 | 1993 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,120 | $700 | Implemented |
ME0103 # 04 Y:1993 | 04 | 1993 | SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS | $8,100 | $20,000 | Not Implemented |
ME0103 # 03 Y:1993 | 03 | 1993 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $69,216 | $175,000 | Not Implemented |
ME0103 # 02 Y:1993 | 02 | 1993 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,470 | $1,300 | Not Implemented |
ME0103 # 01 Y:1993 | 01 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,228 | $180 | Not Implemented |
ME0102 # 01 Y:1993 | 01 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $486 | $90 | Not Implemented |
ME0102 # 05 Y:1993 | 05 | 1993 | OPTIMIZE PLANT POWER FACTOR | $1,363 | $0 | Not Implemented |
ME0102 # 04 Y:1993 | 04 | 1993 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,674 | $1,400 | Implemented |
ME0102 # 03 Y:1993 | 03 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,038 | $7,200 | Implemented |
ME0102 # 02 Y:1993 | 02 | 1993 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,485 | $8,690 | Not Implemented |