IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
SIC 3546 Power-driven Handtools
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0380 # 04 Y:1996 04 1996 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $616 $885 Implemented
OD0005 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $943 $336 Implemented
OD0005 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $179 $97 Implemented
IA0048 # 06 Y:1993 06 1993 INSULATE BARE EQUIPMENT $25 $43 Implemented
IA0048 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,254 $272 Implemented
IA0048 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,403 $500 Implemented
KU0339 # 08 Y:1991 08 1991 TURN OFF EQUIPMENT WHEN NOT IN USE $144 $0 Implemented
KU0339 # 07 Y:1991 07 1991 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $415 $0 Implemented
KU0339 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $83 $119 Implemented
KU0339 # 05 Y:1991 05 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $577 $350 Implemented
KU0339 # 04 Y:1991 04 1991 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $1,066 $525 Implemented
KU0339 # 03 Y:1991 03 1991 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,071 $0 Implemented
KU0339 # 02 Y:1991 02 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,315 $1,860 Implemented
KU0339 # 01 Y:1991 01 1991 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $4,004 $700 Implemented
AM0071 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,325 $1,000 Implemented
AM0071 # 01 Y:1989 01 1989 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,470 $50,000 Implemented
AM0071 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,730 $6,030 Implemented
AM0071 # 04 Y:1989 04 1989 KEEP LAMPS AND REFLECTORS CLEAN $1,855 $6,900 Implemented
AM0071 # 05 Y:1989 05 1989 USE OPTIMUM THICKNESS INSULATION $870 $145 Implemented
AM0071 # 07 Y:1989 07 1989 INSTALL SET-BACK TIMERS $220 $0 Implemented
KU0200 # 01 Y:1986 01 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,229 $14,500 Implemented
KU0200 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,130 $1,000 Implemented
KU0200 # 03 Y:1986 03 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,694 $0 Implemented
KU0200 # 04 Y:1986 04 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $473 $0 Implemented
KU0200 # 05 Y:1986 05 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $198 $0 Implemented