Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 3549 | Metalworking Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0259 # 02 Y:2007 | 02 | 2007 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,332 | $0 | Not Implemented |
SU0259 # 01 Y:2007 | 01 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,279 | $0 | Implemented |
SU0259 # 10 Y:2007 | 10 | 2007 | INSTALL OCCUPANCY SENSORS | $302 | $973 | Implemented |
SU0259 # 09 Y:2007 | 09 | 2007 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $508 | $546 | Not Implemented |
SU0259 # 08 Y:2007 | 08 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $272 | $231 | Implemented |
SU0259 # 07 Y:2007 | 07 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $410 | $232 | Implemented |
SU0259 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $221 | $50 | Implemented |
SU0259 # 05 Y:2007 | 05 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $290 | $38 | Implemented |
SU0259 # 04 Y:2007 | 04 | 2007 | AIR CONDITION ONLY SPACE NECESSARY | $763 | $13 | Implemented |
SU0259 # 03 Y:2007 | 03 | 2007 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $411 | $0 | Not Implemented |
WV0356 # 17 Y:2007 | 17 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $488 | $40 | Implemented |
WV0356 # 16 Y:2007 | 16 | 2007 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $499 | $280 | Not Implemented |
WV0356 # 15 Y:2007 | 15 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $504 | $270 | Implemented |
WV0356 # 14 Y:2007 | 14 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $587 | $500 | Not Implemented |
WV0356 # 13 Y:2007 | 13 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $674 | $155 | Not Implemented |
WV0356 # 12 Y:2007 | 12 | 2007 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $697 | $1,080 | Implemented |
WV0356 # 11 Y:2007 | 11 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $715 | $350 | Implemented |
WV0356 # 10 Y:2007 | 10 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $855 | $1,900 | Implemented |
WV0356 # 09 Y:2007 | 09 | 2007 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $942 | $1,100 | Not Implemented |
WV0356 # 08 Y:2007 | 08 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,061 | $1,000 | Not Implemented |
WV0356 # 07 Y:2007 | 07 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,349 | $1,000 | Implemented |
WV0356 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,880 | $0 | Implemented |
WV0356 # 05 Y:2007 | 05 | 2007 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,275 | $0 | Not Implemented |
WV0356 # 04 Y:2007 | 04 | 2007 | BURN WASTE OIL FOR HEAT | $4,096 | $3,400 | Not Implemented |
WV0356 # 03 Y:2007 | 03 | 2007 | USE HEAT PUMP FOR SPACE CONDITIONING | $5,326 | $9,600 | Implemented |