Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 355 | Special Industry Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0373 # 08 Y:2005 | 08 | 2005 | INSTALL OCCUPANCY SENSORS | $1,668 | $1,925 | Not Implemented |
IA0373 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,784 | $2,706 | Implemented |
IA0373 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,460 | $12,810 | Implemented |
IA0373 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,419 | $5,844 | Implemented |
IA0373 # 04 Y:2005 | 04 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,473 | $1,147 | Implemented |
IA0373 # 09 Y:2005 | 09 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $9,792 | $6,208 | Implemented |
IA0373 # 03 Y:2005 | 03 | 2005 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $1,412 | $143 | Implemented |
IA0373 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,881 | $359 | Implemented |
IA0373 # 01 Y:2005 | 01 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,447 | $94 | Not Implemented |
IA0169 # 07 Y:1997 | 07 | 1997 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $4,866 | $2,300 | Not Implemented |
IA0169 # 11 Y:1997 | 11 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $103 | $205 | Implemented |
IA0169 # 10 Y:1997 | 10 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $229 | $14 | Not Implemented |
IA0169 # 09 Y:1997 | 09 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $665 | $110 | Implemented |
IA0169 # 08 Y:1997 | 08 | 1997 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $1,124 | $0 | Not Implemented |
IA0169 # 06 Y:1997 | 06 | 1997 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,535 | $4,500 | Not Implemented |
IA0169 # 05 Y:1997 | 05 | 1997 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $1,649 | $7,400 | Not Implemented |
IA0169 # 04 Y:1997 | 04 | 1997 | REDUCE VENTILATION AIR | $2,334 | $40 | Implemented |
IA0169 # 03 Y:1997 | 03 | 1997 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,357 | $4,900 | Implemented |
IA0169 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,457 | $25,564 | Implemented |
IA0169 # 01 Y:1997 | 01 | 1997 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $15,243 | $4,200 | Not Implemented |
IA0136 # 01 Y:1996 | 01 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,549 | $75 | Not Implemented |
IA0136 # 06 Y:1996 | 06 | 1996 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $664 | $1,500 | Not Implemented |
IA0136 # 05 Y:1996 | 05 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $226 | $508 | Not Implemented |
IA0136 # 04 Y:1996 | 04 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,221 | $226 | Not Implemented |
IA0136 # 03 Y:1996 | 03 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,926 | $262 | Implemented |