IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
SIC 355 Special Industry Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0502 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $727 $1,218 Implemented
NC0502 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $485 $50 Implemented
NC0502 # 05 Y:2013 05 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $564 $525 Implemented
NC0502 # 01 Y:2013 01 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $911 $1,200 Not Implemented
NC0502 # 02 Y:2013 02 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $864 $600 Implemented
NC0502 # 07 Y:2013 07 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $39 $16 Implemented
NC0502 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $408 $25 Implemented
NC0389 # 05 Y:2009 05 2009 DEVELOP A REPAIR/REPLACE POLICY $571 $892 Implemented
NC0389 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $387 $100 Implemented
NC0389 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $627 $0 Not Implemented
NC0389 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $3,172 $4,300 Not Implemented
NC0389 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,752 $54,282 Not Implemented
NC0117 # 09 Y:1997 09 1997 $5,000 $3,600 Not Implemented
NC0117 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $271 $499 Implemented
NC0117 # 08 Y:1997 08 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $8,850 $1,000 Implemented
NC0117 # 07 Y:1997 07 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,289 $600 Implemented
NC0117 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $886 $982 Implemented
NC0117 # 05 Y:1997 05 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $187 $149 Implemented
NC0117 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $22 $48 Implemented
NC0117 # 03 Y:1997 03 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $791 $140 Implemented
NC0117 # 02 Y:1997 02 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $100 $111 Implemented
TN0616 # 09 Y:1997 09 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $140 $0 Implemented
TN0616 # 03 Y:1997 03 1997 USE RADIANT HEATER FOR SPOT HEATING $6,870 $10,000 Not Implemented
TN0616 # 01 Y:1997 01 1997 $60,000 $19,780 Implemented
TN0616 # 02 Y:1997 02 1997 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS $7,980 $13,100 Not Implemented