Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
50
matching recommendationsSIC | 355 | Special Industry Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0484 # 07 Y:2019 | 07 | 2019 | BURN A LESS EXPENSIVE GRADE OF FUEL | $87,917 | $290,000 | Implemented |
LE0484 # 06 Y:2019 | 06 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $16,879 | $51,500 | Implemented |
LE0484 # 05 Y:2019 | 05 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,805 | $5,500 | Implemented |
LE0484 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,910 | $23,990 | Implemented |
LE0484 # 03 Y:2019 | 03 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,670 | $2,500 | Implemented |
LE0484 # 01 Y:2019 | 01 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $7,603 | $0 | Implemented |
LE0484 # 02 Y:2019 | 02 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,873 | $6,000 | Implemented |
LE0379 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,923 | $1,680 | Not Implemented |
LE0379 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,950 | $11,700 | Not Implemented |
LE0379 # 03 Y:2014 | 03 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $2,644 | $900 | Implemented |
LE0379 # 02 Y:2014 | 02 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $1,602 | $225 | Implemented |
LE0379 # 01 Y:2014 | 01 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,081 | $40 | Implemented |
LE0379 # 05 Y:2014 | 05 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,017 | $500 | Not Implemented |
LE0379 # 06 Y:2014 | 06 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,721 | $1,500 | Not Implemented |
LE0379 # 10 Y:2014 | 10 | 2014 | INSTALL OCCUPANCY SENSORS | $6,671 | $12,825 | Not Implemented |
LE0379 # 07 Y:2014 | 07 | 2014 | INSTALL OCCUPANCY SENSORS | $5,736 | $8,213 | Not Implemented |
LE0379 # 12 Y:2014 | 12 | 2014 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,820 | $6,500 | Not Implemented |
LE0379 # 14 Y:2014 | 14 | 2014 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,690 | $8,000 | Not Implemented |
LE0379 # 09 Y:2014 | 09 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,611 | $3,025 | Not Implemented |
LE0379 # 11 Y:2014 | 11 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $396 | $780 | Implemented |
LE0379 # 13 Y:2014 | 13 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $330 | $1,250 | Not Implemented |
LE0138 # 04 Y:2002 | 04 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $670 | $0 | Implemented |
LE0138 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $563 | $0 | Not Implemented |
LE0138 # 06 Y:2002 | 06 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,471 | $100 | Implemented |
LE0138 # 07 Y:2002 | 07 | 2002 | USE OPTIMUM THICKNESS INSULATION | $1,551 | $60 | Implemented |