IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

62

matching recommendations
Reset
SIC 355 Special Industry Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0254 # 10 Y:1992 10 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,170 $10,320 Implemented
CO0254 # 09 Y:1992 09 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $560 $1,100 Implemented
CO0254 # 08 Y:1992 08 1992 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,940 $14,000 Implemented
CO0254 # 07 Y:1992 07 1992 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,610 $800 Implemented
CO0254 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,020 $1,190 Implemented
CO0254 # 05 Y:1992 05 1992 RECOVER WASTE HEAT FROM EQUIPMENT $1,100 $1,320 Implemented
CO0254 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $690 $160 Implemented
CO0254 # 03 Y:1992 03 1992 UPGRADE CONTROLS ON COMPRESSORS $310 $50 Implemented
CO0254 # 02 Y:1992 02 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,850 $160 Implemented
CO0254 # 01 Y:1992 01 1992 USE MORE EFFICIENT ADHESIVE APPLICATORS $10,925 $2,200 Not Implemented
MO0073 # 06 Y:1992 06 1992 SCHEDULE USE OF ELEVATORS TO CONSERVE ENERGY $211 $314 Not Implemented
MO0073 # 07 Y:1992 07 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,490 $275 Implemented
KU0384 # 01 Y:1992 01 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,255 $100 Implemented
MO0073 # 05 Y:1992 05 1992 RECOVER AND REUSE COOLING WATER $2,686 $0 Not Implemented
MO0073 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $838 $0 Implemented
MO0073 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,565 $4,992 Implemented
MO0073 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,294 $0 Implemented
MO0073 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,242 $1,848 Implemented
KU0384 # 08 Y:1992 08 1992 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $134 $0 Not Implemented
KU0384 # 07 Y:1992 07 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $477 $600 Implemented
KU0384 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $55 $0 Implemented
KU0384 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $841 $1,794 Not Implemented
KU0384 # 04 Y:1992 04 1992 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $730 $2,200 Not Implemented
KU0384 # 03 Y:1992 03 1992 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $1,309 $2,000 Implemented
KU0384 # 02 Y:1992 02 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,424 $0 Not Implemented