IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 355 Special Industry Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0123 # 08 Y:2001 08 2001 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $42 $3 Implemented
SU0123 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $378 $196 Implemented
SU0123 # 04 Y:2001 04 2001 CHECK FOR ACCURACY OF UTILITY / POWER METERS $1,800 $0 Implemented
SU0123 # 03 Y:2001 03 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,325 $7,060 Implemented
SU0123 # 07 Y:2001 07 2001 INSULATE BARE EQUIPMENT $347 $117 Implemented
SU0123 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $2,968 $694 Implemented
SU0123 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $739 $0 Implemented
SU0123 # 01 Y:2001 01 2001 ELIMINATE SHIFT $13,517 $0 Not Implemented
LE0113 # 05 Y:2001 05 2001 INSTALL STEAM TRAP $1,315 $1,600 Not Implemented
LE0113 # 04 Y:2001 04 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,513 $25,360 Not Implemented
LE0113 # 03 Y:2001 03 2001 IMPROVE LUBRICATION PRACTICES $2,615 $400 Not Implemented
LE0113 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,785 $0 Not Implemented
LE0113 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,166 $2,500 Not Implemented
LE0113 # 06 Y:2001 06 2001 COVER OPEN TANKS $5,335 $1,700 Not Implemented
BD0188 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $167 $253 Not Implemented
BD0188 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $223 $0 Not Implemented
BD0188 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $188 $500 Not Implemented
BD0188 # 07 Y:2001 07 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $145 $300 Not Implemented
BD0188 # 08 Y:2001 08 2001 MINIMIZE WATER USAGE $1,095 $1,035 Not Implemented
BD0188 # 09 Y:2001 09 2001 PURCHASE EQUIPMENT INSTEAD OF LEASING $18,000 $50,000 n/a
BD0188 # 10 Y:2001 10 2001 PURCHASE EQUIPMENT INSTEAD OF LEASING $10,800 $20,000 n/a
BD0188 # 11 Y:2001 11 2001 AUTOMATE PAYROLL SYSTEM $1,240 $1,400 Implemented
BD0188 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $1,505 $2,025 Not Implemented
BD0188 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,751 $3,000 Not Implemented
BD0188 # 01 Y:2001 01 2001 USE RADIANT HEATER FOR SPOT HEATING $19,999 $78,750 n/a