Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
47
matching recommendationsSIC | 355 | Special Industry Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0431 # 05 Y:2006 | 05 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $370 | $1,000 | n/a |
AS0431 # 01 Y:2006 | 01 | 2006 | USE SOLAR HEAT TO HEAT WATER | $1,728 | $8,800 | n/a |
AS0431 # 02 Y:2006 | 02 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,413 | $1,500 | n/a |
AS0431 # 03 Y:2006 | 03 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $529 | $1,500 | n/a |
AS0431 # 04 Y:2006 | 04 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $401 | $1,500 | n/a |
UU0107 # 06 Y:2006 | 06 | 2006 | OPTIMIZE PLANT POWER FACTOR | $1,690 | $1,860 | Not Implemented |
UU0107 # 05 Y:2006 | 05 | 2006 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,470 | $8,820 | Not Implemented |
UU0107 # 04 Y:2006 | 04 | 2006 | REPLACE BOILER | $1,090 | $800 | Not Implemented |
UU0107 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,590 | $2,085 | Not Implemented |
UU0107 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $950 | $18 | Not Implemented |
UU0107 # 01 Y:2006 | 01 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $520 | $435 | Not Implemented |
SU0233 # 10 Y:2006 | 10 | 2006 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $392 | $687 | Not Implemented |
SU0233 # 08 Y:2006 | 08 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,003 | $7,100 | Not Implemented |
SU0233 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $47,954 | $81,620 | Not Implemented |
SU0233 # 04 Y:2006 | 04 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,001 | $0 | Implemented |
SU0233 # 05 Y:2006 | 05 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,928 | $542 | Not Implemented |
SU0233 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,395 | $0 | Not Implemented |
SU0233 # 03 Y:2006 | 03 | 2006 | USE SYNTHETIC LUBRICANT | $2,163 | $0 | Implemented |
SU0233 # 01 Y:2006 | 01 | 2006 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $20,203 | $0 | Implemented |
SU0233 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,182 | $1,050 | Implemented |
SU0233 # 11 Y:2006 | 11 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,021 | $11,554 | Not Implemented |
SU0233 # 07 Y:2006 | 07 | 2006 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $14,472 | $9,451 | Not Implemented |
SU0232 # 13 Y:2006 | 13 | 2006 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $517 | $1,545 | Not Implemented |
SU0232 # 03 Y:2006 | 03 | 2006 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,612 | $0 | Implemented |
SU0232 # 04 Y:2006 | 04 | 2006 | USE SYNTHETIC LUBRICANT | $890 | $0 | Implemented |