Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
45
matching recommendationsSIC | 355 | Special Industry Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0543 # 02 Y:2008 | 02 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $61,542 | $40,950 | Implemented |
OR0543 # 11 Y:2008 | 11 | 2008 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $52,540 | $2,200 | Implemented |
OR0543 # 10 Y:2008 | 10 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,500 | $43,600 | Implemented |
OR0543 # 09 Y:2008 | 09 | 2008 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $78,900 | $132,800 | Implemented |
OR0543 # 08 Y:2008 | 08 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,510 | $0 | Implemented |
OR0543 # 07 Y:2008 | 07 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $42,310 | $148,560 | Implemented |
OR0543 # 06 Y:2008 | 06 | 2008 | OPTIMIZE PLANT POWER FACTOR | $10,290 | $54,000 | Implemented |
OR0543 # 05 Y:2008 | 05 | 2008 | INSTALL OCCUPANCY SENSORS | $19,521 | $31,119 | Implemented |
OR0543 # 04 Y:2008 | 04 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,107 | $413 | Implemented |
OR0543 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,017 | $28,000 | Not Implemented |
OR0543 # 01 Y:2008 | 01 | 2008 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $244,531 | $29,019 | Not Implemented |
OR0543 # 12 Y:2008 | 12 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $46,700 | $46,700 | Implemented |
OR0543 # 13 Y:2008 | 13 | 2008 | UPGRADE CONTROLS ON COMPRESSORS | $7,300 | $5,700 | Implemented |
WV0385 # 01 Y:2008 | 01 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $40,090 | $4,000 | Not Implemented |
WV0385 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,198 | $81,425 | Implemented |
WV0385 # 05 Y:2008 | 05 | 2008 | STANDARDIZE MOTOR INVENTORY | $6,638 | $763 | Implemented |
WV0385 # 04 Y:2008 | 04 | 2008 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $14,783 | $5,000 | Not Implemented |
WV0385 # 03 Y:2008 | 03 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $14,879 | $21,600 | Not Implemented |
WV0385 # 07 Y:2008 | 07 | 2008 | INSULATE BARE EQUIPMENT | $3,100 | $140 | Implemented |
WV0385 # 08 Y:2008 | 08 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,980 | $0 | Implemented |
WV0385 # 09 Y:2008 | 09 | 2008 | IMPROVE LUBRICATION PRACTICES | $2,864 | $2,950 | Not Implemented |
WV0385 # 11 Y:2008 | 11 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,425 | $4,393 | Implemented |
WV0385 # 14 Y:2008 | 14 | 2008 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $324 | $50 | Not Implemented |
WV0385 # 06 Y:2008 | 06 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,599 | $548 | Implemented |
WV0385 # 10 Y:2008 | 10 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,986 | $792 | Implemented |