IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
SIC 3553 Woodworking Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0128 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,334 $76 Implemented
IP0128 # 01 Y:2019 01 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $331 $0 Implemented
IP0128 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $2,633 $1,575 Implemented
IP0128 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,549 $36,977 Implemented
UA0122 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,196 $100 Implemented
UA0122 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,373 $7,195 Implemented
WV0240 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,302 $26,610 Implemented
WV0240 # 10 Y:2002 10 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $360 $100 Implemented
WV0240 # 08 Y:2002 08 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $8,531 $1,500 Implemented
WV0240 # 07 Y:2002 07 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $18,364 $1,500 Implemented
WV0240 # 04 Y:2002 04 2002 UTILIZE A LESS EXPENSIVE COOLING METHOD $123 $86 Implemented
WV0240 # 11 Y:2002 11 2002 CLEAR AND RENT EXISTING SPACE $39,500 $2,700 Implemented
WV0240 # 09 Y:2002 09 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,763 $0 Implemented
WV0240 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $213 $163 Implemented
WV0240 # 01 Y:2002 01 2002 INSTALL OCCUPANCY SENSORS $1,256 $450 Implemented
NV0155 # 02 Y:2000 02 2000 INSTALL SKYLIGHTS $4,525 $8,000 Implemented
KU0520 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $250 $250 Implemented
KU0520 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $210 $350 Implemented
KU0520 # 06 Y:1999 06 1999 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $3,440 $3,630 Implemented
KU0520 # 07 Y:1999 07 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $6,720 $8,000 Implemented
DS0115 # 04 Y:1998 04 1998 CONVERT TO ELECTROSTATIC POWDER COATING $10,428 $12,000 Implemented
DS0115 # 03 Y:1998 03 1998 INSTALL TIMERS AND/OR THERMOSTATS $2,850 $930 Implemented
DS0115 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $607 $500 Implemented
DS0115 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,678 $210 Implemented
NC0117 # 08 Y:1997 08 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $8,850 $1,000 Implemented