IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
SIC 3554 Paper Industries Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0085 # 02 Y:2012 02 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,948 $100 Implemented
DL0085 # 03 Y:2012 03 2012 RECOVER WASTE HEAT FROM EQUIPMENT $9,212 $6,080 Implemented
DL0085 # 04 Y:2012 04 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $25,500 $21,080 Implemented
DL0085 # 05 Y:2012 05 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $32,910 $51,500 Implemented
DL0085 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $7,995 $4,850 Implemented
DL0085 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,020 $2,800 Implemented
DL0085 # 08 Y:2012 08 2012 INSTALL OCCUPANCY SENSORS $2,640 $620 Implemented
DL0085 # 10 Y:2012 10 2012 REVISE SMOKE CLEANUP FROM OPERATIONS $3,290 $11,200 Implemented
NC0379 # 04 Y:2008 04 2008 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $2,284 $3,000 Implemented
NC0379 # 01 Y:2008 01 2008 ADJUST BURNERS FOR EFFICIENT OPERATION $871 $800 Implemented
NC0379 # 02 Y:2008 02 2008 LOWER OPERATING PRESSURE OF CONDENSER (STEAM) $333 $100 Implemented
NC0379 # 08 Y:2008 08 2008 DEVELOP A REPAIR/REPLACE POLICY $834 $1,728 Implemented
NC0379 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $269 $100 Implemented
NC0379 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $237 $50 Implemented
NC0379 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $101 $308 Implemented
MS0165 # 01 Y:2000 01 2000 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $10,571 $980 Implemented
MS0165 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $329 $184 Implemented
MS0165 # 03 Y:2000 03 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $293 $54 Implemented
MS0165 # 04 Y:2000 04 2000 ELIMINATE/REDUCE AN OPERATION $1,457 $0 Implemented
HO0219 # 03 Y:2000 03 2000 USE PHOTOCELL CONTROLS $3,386 $1,515 Implemented
HO0219 # 07 Y:2000 07 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $3,102 $4,641 Implemented
HO0219 # 06 Y:2000 06 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $13,935 $8,000 Implemented
HO0219 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,271 $1,500 Implemented
HO0219 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $2,714 $5,000 Implemented
HO0219 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,633 $18,330 Implemented