Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
117
matching recommendationsSIC | 3555 | Printing Trades Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1019 # 04 Y:2020 | 04 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $9,326 | $1,400 | Not Implemented |
UD1019 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,619 | $82,620 | Implemented |
UD1019 # 01 Y:2020 | 01 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,684 | $0 | Implemented |
UD1019 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,713 | $11,014 | Not Implemented |
UD1019 # 06 Y:2020 | 06 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $21,134 | $7,500 | Not Implemented |
UD1019 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,924 | $1,000 | Not Implemented |
UD1019 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,086 | $0 | Not Implemented |
UD1019 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,469 | $10,920 | Not Implemented |
IP0118 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,954 | $824 | Implemented |
IP0118 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,154 | $1,526 | Implemented |
IP0118 # 03 Y:2019 | 03 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,045 | $2,439 | Not Implemented |
IP0118 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,021 | $10,215 | Implemented |
UD0833 # 16 Y:2011 | 16 | 2011 | USE RADIANT HEATER FOR SPOT HEATING | $1,061 | $2,800 | Not Implemented |
UD0833 # 13 Y:2011 | 13 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $21,754 | $100 | Not Implemented |
UD0833 # 17 Y:2011 | 17 | 2011 | USE SOLAR HEAT TO MAKE ELECTRICTY | $23,107 | $145,390 | Not Implemented |
UD0833 # 14 Y:2011 | 14 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,701 | $20,000 | Not Implemented |
UD0833 # 12 Y:2011 | 12 | 2011 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $37,935 | $100 | Implemented |
UD0833 # 08 Y:2011 | 08 | 2011 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,523 | $10,500 | Not Implemented |
UD0833 # 02 Y:2011 | 02 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,467 | $25 | Implemented |
UD0833 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,026 | $500 | Not Implemented |
UD0833 # 10 Y:2011 | 10 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $844 | $50 | Implemented |
UD0833 # 09 Y:2011 | 09 | 2011 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $5,553 | $100 | Not Implemented |
UD0833 # 05 Y:2011 | 05 | 2011 | UPGRADE OBSOLETE EQUIPMENT | $3,710 | $12,661 | Not Implemented |
UD0833 # 06 Y:2011 | 06 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,343 | $500 | Implemented |
UD0833 # 07 Y:2011 | 07 | 2011 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,144 | $600 | Not Implemented |