IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

369

matching recommendations
Reset
SIC 3556 Food Products Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0022 # 09 Y:1995 09 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $7,818 $0 Implemented
NV0022 # 10 Y:1995 10 1995 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $747 $0 Implemented
OD0023 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,283 $67,113 Implemented
OD0023 # 02 Y:1995 02 1995 INSTALL TIMERS AND/OR THERMOSTATS $6,341 $1,560 Not Implemented
OD0023 # 03 Y:1995 03 1995 INSTALL TIMERS AND/OR THERMOSTATS $2,461 $1,365 Implemented
OD0023 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $245 $272 Not Implemented
OD0023 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $387 $292 Implemented
OD0023 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $676 $500 Implemented
OD0023 # 07 Y:1995 07 1995 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $1,061 $610 Not Implemented
NC0027 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,154 $412 Not Implemented
NC0027 # 02 Y:1994 02 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,555 $0 Not Implemented
NC0027 # 03 Y:1994 03 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,007 $240 Not Implemented
NC0027 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,702 $390 Implemented
NC0027 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $419 $250 Implemented
NC0027 # 06 Y:1994 06 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,686 $5,000 Not Implemented
NC0027 # 07 Y:1994 07 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,864 $500 Implemented
NC0018 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,012 $480 Implemented
NC0018 # 02 Y:1994 02 1994 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $742 $350 Not Implemented
NC0018 # 03 Y:1994 03 1994 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $24,252 $11,500 Implemented
NC0018 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,437 $6,600 Implemented
NC0018 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,509 $1,046 Not Implemented
WI0202 # 10 Y:1994 10 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $321 $1,280 Not Implemented
WI0202 # 09 Y:1994 09 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $451 $0 Implemented
WI0202 # 08 Y:1994 08 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $609 $400 Implemented
WI0202 # 07 Y:1994 07 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $833 $0 Not Implemented