IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 3556 Food Products Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0128 # 05 Y:1995 05 1995 OPTIMIZE PLANT POWER FACTOR $7,271 $6,758 n/a
UL0128 # 04 Y:1995 04 1995 OPTIMIZE PLANT POWER FACTOR $5,045 $6,400 n/a
UL0128 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,597 $2,650 n/a
UL0128 # 02 Y:1995 02 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $687 $1,000 n/a
UL0128 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,956 $1,721 n/a
KU0452 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $132 $180 Implemented
KU0452 # 09 Y:1995 09 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $202 $60 Not Implemented
KU0452 # 07 Y:1995 07 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $696 $105 Implemented
KU0452 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,078 $33,851 Implemented
KU0452 # 03 Y:1995 03 1995 REDUCE VENTILATION AIR $4,480 $2,714 Not Implemented
KU0452 # 04 Y:1995 04 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $2,106 $2,382 Not Implemented
KU0452 # 05 Y:1995 05 1995 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,286 $2,030 Not Implemented
KU0452 # 06 Y:1995 06 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $323 $150 Implemented
KU0452 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $513 $129 Implemented
NV0022 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,811 $500 Implemented
NV0022 # 01 Y:1995 01 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $17,180 $0 Implemented
NV0022 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,777 $22,381 Not Implemented
NV0022 # 03 Y:1995 03 1995 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $5,257 $5,037 Implemented
NV0022 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,572 $687 Implemented
NV0022 # 10 Y:1995 10 1995 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $747 $0 Implemented
NV0022 # 09 Y:1995 09 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $7,818 $0 Implemented
NV0022 # 08 Y:1995 08 1995 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,330 $27 Implemented
NV0022 # 07 Y:1995 07 1995 OPTIMIZE PLANT POWER FACTOR $2,991 $8,190 Not Implemented
NV0022 # 05 Y:1995 05 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $2,315 $649 Not Implemented
OD0023 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,283 $67,113 Implemented