IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

747

matching recommendations
Reset
SIC 3559 Special Industry Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0430 # 06 Y:2013 06 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $841 $2,072 Not Implemented
SF0430 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,332 $4,481 Not Implemented
SF0430 # 08 Y:2013 08 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,029 $5,603 Not Implemented
MA0707 # 01 Y:2013 01 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,613 $1,000 Implemented
MA0707 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $972 $200 Implemented
MA0707 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $807 $1,840 Not Implemented
MA0707 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $439 $3,057 Not Implemented
MA0707 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $412 $200 Implemented
NC0467 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $146 $652 Implemented
NC0467 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $290 $1,265 Not Implemented
NC0467 # 03 Y:2012 03 2012 INSTALL SPECTRAL REFLECTORS / DELAMP $3,485 $18,400 Not Implemented
NC0467 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,208 $1,180 Implemented
NC0467 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $448 $525 Implemented
NC0467 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $347 $1,200 Not Implemented
NC0467 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $245 $100 Implemented
NC0467 # 08 Y:2012 08 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $459 $300 Implemented
NC0467 # 09 Y:2012 09 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $34,729 $15,000 Implemented
UD0854 # 01 Y:2012 01 2012 USE SOLAR HEAT TO MAKE ELECTRICTY $77,312 $545,213 Not Implemented
UD0854 # 02 Y:2012 02 2012 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS $5,889 $0 Not Implemented
UD0854 # 03 Y:2012 03 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $291 $0 Not Implemented
UD0854 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,511 $1,500 Not Implemented
UD0854 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,351 $0 Not Implemented
UD0854 # 06 Y:2012 06 2012 REDUCE VENTILATION AIR $8,795 $0 Not Implemented
UD0854 # 07 Y:2012 07 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,906 $0 Not Implemented
UD0854 # 08 Y:2012 08 2012 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $513 $857 Not Implemented