IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
SIC 3559 Special Industry Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0385 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,980 $0 Implemented
WV0385 # 09 Y:2008 09 2008 IMPROVE LUBRICATION PRACTICES $2,864 $2,950 Not Implemented
WV0385 # 10 Y:2008 10 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,986 $792 Implemented
WV0385 # 11 Y:2008 11 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,425 $4,393 Implemented
WV0385 # 12 Y:2008 12 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,167 $925 Not Implemented
WV0385 # 14 Y:2008 14 2008 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $324 $50 Not Implemented
WV0096 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,010 $302 Implemented
WV0096 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,892 $4,029 Implemented
WV0096 # 03 Y:1996 03 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $275 $200 Implemented
WV0096 # 04 Y:1996 04 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $538 $1,447 Not Implemented
WV0096 # 05 Y:1996 05 1996 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,406 $490 Implemented
WV0096 # 06 Y:1996 06 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $5,420 $8,250 Not Implemented
UD0485 # 05 Y:1996 05 1996 RECOVER WASTE HEAT FROM EQUIPMENT $6,439 $6,000 Not Implemented
UD0485 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $600 $0 Implemented
UD0485 # 02 Y:1996 02 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,600 $1,200 Not Implemented
UD0485 # 03 Y:1996 03 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,528 $250 Implemented
UD0485 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,249 $12,150 Implemented
UD0485 # 06 Y:1996 06 1996 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $18,918 $6,000 Implemented
UD0294 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,552 $0 Not Implemented
UD0294 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,945 $693 Not Implemented
UD0294 # 01 Y:1989 01 1989 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $464 $0 Implemented
UD0254 # 03 Y:1988 03 1988 USE RADIANT HEATER FOR SPOT HEATING $8,595 $15,000 Implemented
UD0254 # 02 Y:1988 02 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,916 $2,000 Not Implemented
UD0254 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,969 $45,557 Implemented
UD0057 # 02 Y:1982 02 1982 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,865 $5,000 Not Implemented