IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

740

matching recommendations
Reset
SIC 3559 Special Industry Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0191 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,162 $476 Implemented
MA0191 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,066 $4,648 Not Implemented
MA0191 # 05 Y:1990 05 1990 AIR CONDITION ONLY SPACE NECESSARY $7,339 $3,720 Implemented
RU0093 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,497 $183 Implemented
RU0093 # 02 Y:1990 02 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $651 $0 Not Implemented
RU0093 # 03 Y:1990 03 1990 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,109 $1,900 Not Implemented
RU0093 # 04 Y:1990 04 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,811 $2,500 Implemented
RU0093 # 05 Y:1990 05 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,019 $0 Not Implemented
RU0093 # 06 Y:1990 06 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $227 $550 Not Implemented
RU0093 # 07 Y:1990 07 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $5,411 $1,920 Not Implemented
UD0294 # 01 Y:1989 01 1989 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $464 $0 Implemented
UD0294 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,945 $693 Not Implemented
UD0294 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,552 $0 Not Implemented
UD0254 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,969 $45,557 Implemented
UD0254 # 02 Y:1988 02 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,916 $2,000 Not Implemented
UD0254 # 03 Y:1988 03 1988 USE RADIANT HEATER FOR SPOT HEATING $8,595 $15,000 Implemented
MA0099 # 01 Y:1987 01 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $183 $500 Implemented
MA0099 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $757 $136 Implemented
MA0099 # 03 Y:1987 03 1987 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $8,540 $30,000 Not Implemented
MA0099 # 04 Y:1987 04 1987 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $664 $800 Implemented
AM0007 # 01 Y:1987 01 1987 OPTIMIZE PLANT POWER FACTOR $1,648 $5,000 Implemented
AM0007 # 02 Y:1987 02 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $910 $520 Not Implemented
AM0007 # 03 Y:1987 03 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $114 $0 Implemented
AM0007 # 04 Y:1987 04 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,212 $3,205 Implemented
AM0007 # 05 Y:1987 05 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,996 $2,146 Implemented