IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

740

matching recommendations
Reset
SIC 3559 Special Industry Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0957 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $4,660 $7,056 Not Implemented
UD0957 # 09 Y:2016 09 2016 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS $17,416 $4,660 Not Implemented
CO0729 # 01 Y:2016 01 2016 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $70,080 $60,480 n/a
CO0729 # 02 Y:2016 02 2016 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $25,340 $123,200 n/a
CO0729 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,510 $51,780 n/a
CO0729 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,100 $6,040 n/a
MZ0207 # 01 Y:2015 01 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,485 $27,300 Implemented
MZ0207 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,482 $3,430 Implemented
MZ0207 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,538 $880 Implemented
MZ0207 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,096 $1,500 Not Implemented
MZ0207 # 05 Y:2015 05 2015 ELIMINATE/REDUCE AN OPERATION $149 $0 Implemented
UK1509 # 01 Y:2015 01 2015 INSTALL OCCUPANCY SENSORS $1,084 $1,708 Not Implemented
UK1509 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,334 $0 Not Implemented
UK1509 # 03 Y:2015 03 2015 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $218 $0 Implemented
UK1509 # 04 Y:2015 04 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $273 $0 Implemented
UK1509 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,421 $1,200 Not Implemented
UK1509 # 06 Y:2015 06 2015 USE ONLY CERTIFIED MOTOR REPAIR SHOPS $178 $0 Implemented
UK1509 # 07 Y:2015 07 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,118 $800 Implemented
UK1509 # 08 Y:2015 08 2015 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,869 $10,000 Implemented
UK1509 # 09 Y:2015 09 2015 RECOVER WASTE HEAT FROM EQUIPMENT $9,895 $4,000 Implemented
UK1509 # 10 Y:2015 10 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,561 $1,306 Not Implemented
UK1509 # 11 Y:2015 11 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,014 $1,858 Implemented
UK1509 # 12 Y:2015 12 2015 METER WASTE WATER $1,872 $464 Not Implemented
UK1509 # 13 Y:2015 13 2015 ADD AREA LIGHTING SWITCHES $3,010 $654 Not Implemented
UK1509 # 14 Y:2015 14 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,160 $18,174 Implemented