IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
SIC 3559 Special Industry Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0957 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,859 $86,636 Implemented
UD0957 # 03 Y:2016 03 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,975 $0 Not Implemented
UD0957 # 02 Y:2016 02 2016 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $7,063 $0 Implemented
UD0957 # 01 Y:2016 01 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,501 $0 Not Implemented
UD0957 # 09 Y:2016 09 2016 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS $17,416 $4,660 Not Implemented
UD0957 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,040 $1,000 Not Implemented
UD0957 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,213 $0 Implemented
UD0957 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,818 $6,804 Implemented
UD0957 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $4,660 $7,056 Not Implemented
UD0854 # 01 Y:2012 01 2012 USE SOLAR HEAT TO MAKE ELECTRICTY $77,312 $545,213 Not Implemented
UD0854 # 08 Y:2012 08 2012 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $513 $857 Not Implemented
UD0854 # 07 Y:2012 07 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,906 $0 Not Implemented
UD0854 # 06 Y:2012 06 2012 REDUCE VENTILATION AIR $8,795 $0 Not Implemented
UD0854 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,351 $0 Not Implemented
UD0854 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,511 $1,500 Not Implemented
UD0854 # 03 Y:2012 03 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $291 $0 Not Implemented
UD0854 # 02 Y:2012 02 2012 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS $5,889 $0 Not Implemented
WV0385 # 03 Y:2008 03 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,879 $21,600 Not Implemented
WV0385 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,198 $81,425 Implemented
WV0385 # 01 Y:2008 01 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $40,090 $4,000 Not Implemented
WV0385 # 14 Y:2008 14 2008 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $324 $50 Not Implemented
WV0385 # 07 Y:2008 07 2008 INSULATE BARE EQUIPMENT $3,100 $140 Implemented
WV0385 # 04 Y:2008 04 2008 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $14,783 $5,000 Not Implemented
WV0385 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,980 $0 Implemented
WV0385 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,599 $548 Implemented