Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
52
matching recommendationsSIC | 3559 | Special Industry Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0957 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,859 | $86,636 | Implemented |
UD0957 # 03 Y:2016 | 03 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,975 | $0 | Not Implemented |
UD0957 # 02 Y:2016 | 02 | 2016 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $7,063 | $0 | Implemented |
UD0957 # 01 Y:2016 | 01 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,501 | $0 | Not Implemented |
UD0957 # 09 Y:2016 | 09 | 2016 | CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS | $17,416 | $4,660 | Not Implemented |
UD0957 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,040 | $1,000 | Not Implemented |
UD0957 # 04 Y:2016 | 04 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,213 | $0 | Implemented |
UD0957 # 07 Y:2016 | 07 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,818 | $6,804 | Implemented |
UD0957 # 08 Y:2016 | 08 | 2016 | INSTALL OCCUPANCY SENSORS | $4,660 | $7,056 | Not Implemented |
UD0854 # 01 Y:2012 | 01 | 2012 | USE SOLAR HEAT TO MAKE ELECTRICTY | $77,312 | $545,213 | Not Implemented |
UD0854 # 08 Y:2012 | 08 | 2012 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $513 | $857 | Not Implemented |
UD0854 # 07 Y:2012 | 07 | 2012 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,906 | $0 | Not Implemented |
UD0854 # 06 Y:2012 | 06 | 2012 | REDUCE VENTILATION AIR | $8,795 | $0 | Not Implemented |
UD0854 # 05 Y:2012 | 05 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,351 | $0 | Not Implemented |
UD0854 # 04 Y:2012 | 04 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,511 | $1,500 | Not Implemented |
UD0854 # 03 Y:2012 | 03 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $291 | $0 | Not Implemented |
UD0854 # 02 Y:2012 | 02 | 2012 | SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS | $5,889 | $0 | Not Implemented |
WV0385 # 03 Y:2008 | 03 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $14,879 | $21,600 | Not Implemented |
WV0385 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,198 | $81,425 | Implemented |
WV0385 # 01 Y:2008 | 01 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $40,090 | $4,000 | Not Implemented |
WV0385 # 14 Y:2008 | 14 | 2008 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $324 | $50 | Not Implemented |
WV0385 # 07 Y:2008 | 07 | 2008 | INSULATE BARE EQUIPMENT | $3,100 | $140 | Implemented |
WV0385 # 04 Y:2008 | 04 | 2008 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $14,783 | $5,000 | Not Implemented |
WV0385 # 08 Y:2008 | 08 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,980 | $0 | Implemented |
WV0385 # 06 Y:2008 | 06 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,599 | $548 | Implemented |