IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 3559 Special Industry Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0138 # 07 Y:2002 07 2002 USE OPTIMUM THICKNESS INSULATION $1,551 $60 Implemented
LE0138 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,471 $100 Implemented
LE0138 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $563 $0 Not Implemented
LE0138 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $670 $0 Implemented
LE0138 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $897 $147 Not Implemented
LE0138 # 02 Y:2002 02 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $27,336 $6,800 Not Implemented
LE0138 # 01 Y:2002 01 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $311 $500 Not Implemented
SF0239 # 06 Y:2002 06 2002 REUSE / RECYCLE/ SELL PAPER PRODUCTS $20,800 $0 Not Implemented
SF0239 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,127 $33,923 Not Implemented
SF0239 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $324 $480 Not Implemented
SF0239 # 03 Y:2002 03 2002 REDUCE FLUID FLOW RATES $34,956 $25,339 Not Implemented
SF0239 # 02 Y:2002 02 2002 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $8,588 $460 Not Implemented
SF0239 # 01 Y:2002 01 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,912 $0 Not Implemented
OK0636 # 06 Y:2002 06 2002 BURN WOOD BY-PRODUCTS FOR HEAT $15,400 $22,800 Not Implemented
OK0636 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,410 $1,400 Implemented
OK0636 # 04 Y:2002 04 2002 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $175,200 $12,800 Implemented
OK0636 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,565 $16,300 Implemented
OK0636 # 02 Y:2002 02 2002 COVER OPEN TANKS $2,412 $528 Not Implemented
OK0636 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $6,525 $1,500 Not Implemented
AM0409 # 01 Y:2002 01 2002 OPTIMIZE PLANT POWER FACTOR $10,660 $15,375 Implemented
AM0409 # 02 Y:2002 02 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,870 $12,210 Implemented
AM0409 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,120 $6,440 Implemented
AM0409 # 04 Y:2002 04 2002 REUSE RAGS UNTIL COMPLETELY SOILED $1,850 $0 Implemented
AM0409 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,600 $800 Implemented
AM0409 # 06 Y:2002 06 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,140 $0 Implemented