Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsSIC | 3559 | Special Industry Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0207 # 01 Y:2015 | 01 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,485 | $27,300 | Implemented |
MZ0207 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,482 | $3,430 | Implemented |
MZ0207 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,538 | $880 | Implemented |
MZ0207 # 04 Y:2015 | 04 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,096 | $1,500 | Not Implemented |
MZ0207 # 05 Y:2015 | 05 | 2015 | ELIMINATE/REDUCE AN OPERATION | $149 | $0 | Implemented |
UK1509 # 03 Y:2015 | 03 | 2015 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $218 | $0 | Implemented |
UK1509 # 15 Y:2015 | 15 | 2015 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $5,579 | $4,086 | Implemented |
UK1509 # 14 Y:2015 | 14 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,160 | $18,174 | Implemented |
UK1509 # 13 Y:2015 | 13 | 2015 | ADD AREA LIGHTING SWITCHES | $3,010 | $654 | Not Implemented |
UK1509 # 12 Y:2015 | 12 | 2015 | METER WASTE WATER | $1,872 | $464 | Not Implemented |
UK1509 # 11 Y:2015 | 11 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,014 | $1,858 | Implemented |
UK1509 # 10 Y:2015 | 10 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,561 | $1,306 | Not Implemented |
UK1509 # 09 Y:2015 | 09 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,895 | $4,000 | Implemented |
UK1509 # 08 Y:2015 | 08 | 2015 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,869 | $10,000 | Implemented |
UK1509 # 07 Y:2015 | 07 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,118 | $800 | Implemented |
UK1509 # 06 Y:2015 | 06 | 2015 | USE ONLY CERTIFIED MOTOR REPAIR SHOPS | $178 | $0 | Implemented |
UK1509 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,421 | $1,200 | Not Implemented |
UK1509 # 04 Y:2015 | 04 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $273 | $0 | Implemented |
UK1509 # 02 Y:2015 | 02 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,334 | $0 | Not Implemented |
UK1509 # 01 Y:2015 | 01 | 2015 | INSTALL OCCUPANCY SENSORS | $1,084 | $1,708 | Not Implemented |
IP0045 # 01 Y:2015 | 01 | 2015 | APPLY FOR INVESTMENT INCENTIVES | $1,605 | $0 | Implemented |
IP0045 # 05 Y:2015 | 05 | 2015 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,201 | $17,250 | Implemented |
IP0045 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,242 | $417 | Implemented |
IP0045 # 03 Y:2015 | 03 | 2015 | BURN A LESS EXPENSIVE GRADE OF FUEL | $25,783 | $1,054 | Implemented |
IP0045 # 02 Y:2015 | 02 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $401 | $0 | Implemented |