Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,281
matching recommendationsSIC | 356 | General Industrial Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0326 # 08 Y:2025 | 08 | 2025 | INSTALL OCCUPANCY SENSORS | $1,871 | $4,200 | n/a |
TT0326 # 04 Y:2025 | 04 | 2025 | INSULATE BARE EQUIPMENT | $3,234 | $3,600 | n/a |
TT0326 # 05 Y:2025 | 05 | 2025 | OPTIMIZE PLANT POWER FACTOR | $2,637 | $3,000 | n/a |
TT0326 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,814 | $870 | n/a |
TT0326 # 06 Y:2025 | 06 | 2025 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $8,775 | $15,000 | n/a |
TT0326 # 07 Y:2025 | 07 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $50,975 | $110,000 | n/a |
TT0326 # 02 Y:2025 | 02 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $7,420 | $1,800 | n/a |
TT0326 # 09 Y:2025 | 09 | 2025 | USE SOLAR HEAT FOR HEAT | $87,059 | $375,030 | n/a |
TT0326 # 03 Y:2025 | 03 | 2025 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,701 | $2,400 | n/a |
TT0326 # 10 Y:2025 | 10 | 2025 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $47,285 | $724,290 | n/a |
WM0238 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,613 | $0 | n/a |
WM0238 # 04 Y:2025 | 04 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $624 | $0 | n/a |
WM0238 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,981 | $3,250 | n/a |
WM0238 # 03 Y:2025 | 03 | 2025 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,555 | $2,185 | n/a |
GT0992 # 05 Y:2025 | 05 | 2025 | PAY UTILITY BILLS ON TIME | $95 | $50 | n/a |
GT0992 # 06 Y:2025 | 06 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $350 | $200 | n/a |
GT0992 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $951 | $400 | n/a |
GT0992 # 03 Y:2025 | 03 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $328 | $135 | n/a |
GT0992 # 07 Y:2025 | 07 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $13,642 | $39,500 | n/a |
GT0992 # 09 Y:2025 | 09 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $53,987 | $203,336 | n/a |
GT0992 # 08 Y:2025 | 08 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $58,314 | $193,000 | n/a |
GT0992 # 01 Y:2025 | 01 | 2025 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,701 | $100 | n/a |
GT0992 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,215 | $1,850 | n/a |
GT0992 # 10 Y:2025 | 10 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $271 | $1,039 | n/a |
NT0031 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,036 | $4,553 | n/a |