Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,257
matching recommendationsSIC | 356 | General Industrial Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NT0031 # 03 Y:2024 | 03 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $150,000 | $20,430 | n/a |
NT0031 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,036 | $4,553 | n/a |
NT0031 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,218 | $3,621 | n/a |
NT0031 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $18,170 | $0 | n/a |
NT0031 # 05 Y:2024 | 05 | 2024 | APPLY FOR INVESTMENT INCENTIVES | $6,219 | $10,000 | n/a |
UD1087 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $684 | $0 | n/a |
UD1087 # 05 Y:2024 | 05 | 2024 | OPTIMIZE PLANT POWER FACTOR | $3,614 | $6,258 | n/a |
UD1087 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $399 | $1,254 | n/a |
UD1087 # 04 Y:2024 | 04 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $452 | $487 | n/a |
UD1087 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,975 | $0 | n/a |
UD1087 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,335 | $1,068 | n/a |
UD1087 # 07 Y:2024 | 07 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $303 | $900 | n/a |
UD1087 # 08 Y:2024 | 08 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $601 | $2,093 | n/a |
UL2313 # 06 Y:2023 | 06 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,989 | $15,000 | Not Implemented |
UL2313 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,325 | $2,880 | Not Implemented |
UL2313 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,411 | $30,977 | Not Implemented |
UL2313 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,566 | $0 | Not Implemented |
UL2313 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $95,755 | $917,406 | Not Implemented |
UL2313 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,515 | $14,625 | Not Implemented |
UC2315 # 02 Y:2023 | 02 | 2023 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $354 | $222 | n/a |
UC2315 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,231 | $150 | n/a |
UC2315 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $534 | $75 | n/a |
UC2315 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,868 | $11,165 | n/a |
UC2315 # 01 Y:2023 | 01 | 2023 | PAY UTILITY BILLS ON TIME | $269 | $0 | n/a |
UC2315 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $323 | $855 | n/a |