IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,257

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0031 # 05 Y:2024 05 2024 APPLY FOR INVESTMENT INCENTIVES $6,219 $10,000 n/a
NT0031 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,036 $4,553 n/a
NT0031 # 03 Y:2024 03 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $150,000 $20,430 n/a
NT0031 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,218 $3,621 n/a
NT0031 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $18,170 $0 n/a
UD1087 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,335 $1,068 n/a
UD1087 # 04 Y:2024 04 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $452 $487 n/a
UD1087 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $684 $0 n/a
UD1087 # 01 Y:2024 01 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,975 $0 n/a
UD1087 # 05 Y:2024 05 2024 OPTIMIZE PLANT POWER FACTOR $3,614 $6,258 n/a
UD1087 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $399 $1,254 n/a
UD1087 # 07 Y:2024 07 2024 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $303 $900 n/a
UD1087 # 08 Y:2024 08 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $601 $2,093 n/a
UL2313 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,566 $0 Not Implemented
UL2313 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $95,755 $917,406 Not Implemented
UL2313 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,325 $2,880 Not Implemented
UL2313 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,411 $30,977 Not Implemented
UL2313 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,515 $14,625 Not Implemented
UL2313 # 06 Y:2023 06 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,989 $15,000 Not Implemented
UC2315 # 09 Y:2023 09 2023 USE HEAT PUMP FOR SPACE CONDITIONING $5,665 $31,002 n/a
UC2315 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $534 $75 n/a
UC2315 # 12 Y:2023 12 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $9,576 $41,370 n/a
UC2315 # 10 Y:2023 10 2023 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $3,746 $34,025 n/a
UC2315 # 11 Y:2023 11 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $29,189 $268,543 n/a
UC2315 # 02 Y:2023 02 2023 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $354 $222 n/a