IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,257

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0034 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,480 $6,401 Implemented
WI0034 # 04 Y:1988 04 1988 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $434 $0 Implemented
WI0034 # 05 Y:1988 05 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,338 $20,000 Not Implemented
OK0262 # 01 Y:1988 01 1988 INSTALL TIMERS AND/OR THERMOSTATS $15,713 $3,089 Implemented
OK0262 # 02 Y:1988 02 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,723 $0 Not Implemented
OK0262 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $495 $0 Implemented
OK0262 # 04 Y:1988 04 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,786 $0 Implemented
OK0262 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $982 $840 Implemented
OK0262 # 06 Y:1988 06 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,610 $9,800 Not Implemented
TN0343 # 01 Y:1988 01 1988 KEEP LAMPS AND REFLECTORS CLEAN $42,911 $23,701 Implemented
TN0343 # 02 Y:1988 02 1988 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $14,762 $35,660 Not Implemented
TN0343 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,447 $4,500 Implemented
TN0343 # 04 Y:1988 04 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,721 $0 Not Implemented
TN0343 # 05 Y:1988 05 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,610 $2,000 Implemented
TN0343 # 06 Y:1988 06 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,647 $780 Implemented
TN0343 # 07 Y:1988 07 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,034 $1,300 Implemented
MA0116 # 01 Y:1988 01 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,841 $320 Not Implemented
MA0116 # 02 Y:1988 02 1988 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $435 $515 Not Implemented
MA0116 # 03 Y:1988 03 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,585 $0 Not Implemented
MA0116 # 04 Y:1988 04 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,632 $1,450 Not Implemented
MA0116 # 05 Y:1988 05 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $9,500 $7,500 Not Implemented
MA0114 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,356 $10,888 Implemented
MA0114 # 02 Y:1988 02 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $3,355 $8,000 Implemented
MA0114 # 03 Y:1988 03 1988 TURN OFF EQUIPMENT WHEN NOT IN USE $192 $0 Not Implemented
MA0114 # 04 Y:1988 04 1988 OPTIMIZE PLANT POWER FACTOR $9,930 $23,000 Implemented