Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,257
matching recommendationsSIC | 356 | General Industrial Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0347 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,870 | $12,067 | Implemented |
MI0347 # 06 Y:2019 | 06 | 2019 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $4,152 | $10,680 | Not Implemented |
MI0347 # 07 Y:2019 | 07 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,680 | $2,020 | Not Implemented |
MI0347 # 08 Y:2019 | 08 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,489 | $5,529 | Implemented |
MI0347 # 09 Y:2019 | 09 | 2019 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,469 | $1,640 | Not Implemented |
MI0347 # 10 Y:2019 | 10 | 2019 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,492 | $7,000 | Not Implemented |
MI0347 # 11 Y:2019 | 11 | 2019 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,617 | $1,707 | Implemented |
MI0347 # 12 Y:2019 | 12 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $547 | $480 | Implemented |
SD0574 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,259 | $0 | Implemented |
SD0574 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $886 | $300 | Implemented |
SD0574 # 03 Y:2019 | 03 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $485 | $1,290 | Not Implemented |
SD0574 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $332 | $0 | Not Implemented |
SD0574 # 05 Y:2019 | 05 | 2019 | REDUCE SCRAP PRODUCTION | $25,514 | $1,500 | Implemented |
UU0138 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,221 | $18,137 | Implemented |
UU0138 # 02 Y:2018 | 02 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,044 | $2,760 | Implemented |
UU0138 # 03 Y:2018 | 03 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,911 | $0 | Implemented |
UU0138 # 04 Y:2018 | 04 | 2018 | INSTALL OCCUPANCY SENSORS | $1,089 | $1,500 | Implemented |
UU0138 # 05 Y:2018 | 05 | 2018 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $615 | $0 | Implemented |
UU0138 # 06 Y:2018 | 06 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $599 | $150 | Implemented |
GT0915 # 01 Y:2018 | 01 | 2018 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,293 | $100 | Implemented |
GT0915 # 02 Y:2018 | 02 | 2018 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,909 | $580 | Implemented |
GT0915 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,057 | $13,064 | Implemented |
GT0915 # 04 Y:2018 | 04 | 2018 | USE SOLAR HEAT TO MAKE ELECTRICTY | $36,802 | $531,855 | Not Implemented |
IP0101 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,806 | $46,651 | Implemented |
IP0101 # 02 Y:2018 | 02 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $232 | $498 | Implemented |