IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,257

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2315 # 07 Y:2023 07 2023 INSTALL TIMERS AND/OR THERMOSTATS $1,770 $559 n/a
UC2315 # 09 Y:2023 09 2023 USE HEAT PUMP FOR SPACE CONDITIONING $5,665 $31,002 n/a
UC2315 # 13 Y:2023 13 2023 ADOPT IN-HOUSE MATERIAL GENERATION $10,809 $60,198 n/a
UC2315 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,231 $150 n/a
UC2315 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,868 $11,165 n/a
UC2315 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $323 $855 n/a
UC2315 # 10 Y:2023 10 2023 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $3,746 $34,025 n/a
UL2310 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,462 $0 Not Implemented
UL2310 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $550 $2,438 Not Implemented
UL2310 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $159,497 $1,065,693 Not Implemented
UL2310 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,694 $540 Not Implemented
UL2310 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $145,022 $23,878 Not Implemented
UL2310 # 02 Y:2023 02 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,283 $0 Not Implemented
WM0205 # 01 Y:2023 01 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,577 $0 Not Implemented
WM0205 # 02 Y:2023 02 2023 USE RADIANT HEATER FOR SPOT HEATING $3,501 $13,280 Not Implemented
WM0205 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,309 $1,827 Not Implemented
WM0205 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $690 $3,044 Not Implemented
WM0205 # 05 Y:2023 05 2023 USE COMPRESSOR AIR FILTERS $595 $2,789 Not Implemented
WM0205 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $540 $148 Not Implemented
WM0205 # 07 Y:2023 07 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $367 $240 Not Implemented
MU0028 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,186 $0 Implemented
MU0028 # 03 Y:2023 03 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,919 $0 Implemented
MU0028 # 04 Y:2023 04 2023 USE PHOTOCELL CONTROLS $138 $348 Implemented
MU0028 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $863 $112 Implemented
MU0028 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,322 $0 Not Implemented