IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,244

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1058 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,636 $952 Implemented
UD1058 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,990 $11,117 Not Implemented
UD1058 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $329 $0 Not Implemented
UD1058 # 02 Y:2023 02 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $282 $0 Implemented
UD1058 # 01 Y:2023 01 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $23,188 $0 Not Implemented
TT0295 # 06 Y:2023 06 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $377 $150 Not Implemented
TT0295 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $646 $2,610 Not Implemented
TT0295 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,448 $2,000 Not Implemented
TT0295 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,010 $1,360 Not Implemented
TT0295 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,115 $20,000 Not Implemented
TT0295 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $13,897 $44,225 Not Implemented
SU0531 # 11 Y:2023 11 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,818 $8,523 n/a
SU0531 # 10 Y:2023 10 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,531 $2,041 n/a
SU0531 # 09 Y:2023 09 2023 RECOVER WASTE HEAT FROM EQUIPMENT $428 $528 n/a
SU0531 # 08 Y:2023 08 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $32,789 $29,395 n/a
SU0531 # 07 Y:2023 07 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,355 $156 n/a
SU0531 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,000 $102 n/a
SU0531 # 05 Y:2023 05 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,436 $70 n/a
SU0531 # 04 Y:2023 04 2023 DISCONNECT BALLASTS $603 $0 n/a
SU0531 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,464 $0 n/a
SU0531 # 02 Y:2023 02 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,557 $0 n/a
SU0531 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,031 $0 n/a
UU0220 # 01 Y:2023 01 2023 USE HEAT PUMP FOR SPACE CONDITIONING $67,069 $0 Implemented
UU0220 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $3,986 $13,500 Implemented
UU0220 # 03 Y:2023 03 2023 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $2,450 $3,366 Not Implemented