IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,257

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0094 # 06 Y:2012 06 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,392 $7,320 Not Implemented
DL0094 # 07 Y:2012 07 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $570 $10 Not Implemented
TT0089 # 01 Y:2012 01 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,022 $6,293 Not Implemented
TT0089 # 02 Y:2012 02 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,031 $89,180 Not Implemented
TT0089 # 03 Y:2012 03 2012 USE SOLAR HEAT FOR HEAT $25,369 $109,680 Not Implemented
TT0089 # 04 Y:2012 04 2012 INSTALL SKYLIGHTS $7,188 $96,000 Not Implemented
UA0079 # 01 Y:2012 01 2012 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $57,749 $240,000 Not Implemented
UA0079 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $6,836 $1,500 Not Implemented
UA0079 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,031 $6,195 Not Implemented
UA0079 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,119 $480 Implemented
UA0079 # 05 Y:2012 05 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $112 $106 Implemented
BD0409 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,259 $41,728 Implemented
BD0409 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $11,228 $2,550 Implemented
BD0409 # 03 Y:2012 03 2012 RECOVER WASTE HEAT FROM EQUIPMENT $4,270 $2,500 Not Implemented
BD0409 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,040 $3,510 Implemented
BD0409 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,253 $10 Not Implemented
BD0409 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $793 $500 Not Implemented
BD0409 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $535 $450 Implemented
BD0409 # 08 Y:2012 08 2012 USE PHOTOCELL CONTROLS $307 $200 Implemented
BD0409 # 09 Y:2012 09 2012 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,782 $1,500 Not Implemented
BD0409 # 10 Y:2012 10 2012 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $1,032 $1,600 Not Implemented
BD0409 # 11 Y:2012 11 2012 USE EVAPORATION TO CONCENTRATE MATERIAL $153 $600 Not Implemented
IA0476 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,431 $17,319 Not Implemented
IA0476 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $1,471 $2,422 Not Implemented
IA0476 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,805 $2,292 Not Implemented