IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,257

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0138 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $798 $110 Not Implemented
AR0138 # 03 Y:1998 03 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $465 $120 Implemented
AR0138 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $367 $615 Implemented
AR0138 # 05 Y:1998 05 1998 RECOVER WASTE HEAT FROM EQUIPMENT $6,014 $998 Not Implemented
AR0138 # 06 Y:1998 06 1998 INSULATE BARE EQUIPMENT $1,276 $182 Implemented
AR0138 # 07 Y:1998 07 1998 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $5,107 $8,000 Not Implemented
AR0138 # 08 Y:1998 08 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,864 $5,900 Not Implemented
AR0138 # 09 Y:1998 09 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $2,411 $1,595 Implemented
AR0138 # 10 Y:1998 10 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $951 $2,000 Not Implemented
KU0491 # 01 Y:1998 01 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,610 $1,000 Implemented
KU0491 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $760 $2,630 Implemented
KU0491 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $640 $780 Implemented
KU0491 # 04 Y:1998 04 1998 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $590 $800 Not Implemented
KU0491 # 05 Y:1998 05 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $420 $690 Not Implemented
KU0491 # 06 Y:1998 06 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $370 $1,140 Not Implemented
KU0491 # 07 Y:1998 07 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $240 $210 Implemented
KU0491 # 08 Y:1998 08 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,650 $7,000 Not Implemented
KU0491 # 09 Y:1998 09 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,560 $0 Implemented
KU0491 # 10 Y:1998 10 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $54,580 $150,500 Not Implemented
KU0491 # 11 Y:1998 11 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $34,550 $60,000 Implemented
UD0545 # 01 Y:1998 01 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,114 $15,000 Not Implemented
UD0545 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,984 $10,116 Implemented
UD0545 # 03 Y:1998 03 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,753 $500 Not Implemented
UD0545 # 04 Y:1998 04 1998 COMBINE UTILITY METERS $308 $0 Not Implemented
TN0630 # 01 Y:1998 01 1998 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $15,740 $48,585 Not Implemented