IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,257

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0282 # 05 Y:1997 05 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,055 $500 Not Implemented
ND0282 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $866 $460 Implemented
ND0282 # 07 Y:1997 07 1997 INSTALL OCCUPANCY SENSORS $724 $1,000 Not Implemented
ND0282 # 08 Y:1997 08 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $571 $108 Not Implemented
ND0282 # 09 Y:1997 09 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $482 $910 Not Implemented
ND0282 # 10 Y:1997 10 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $360 $0 Not Implemented
ND0282 # 11 Y:1997 11 1997 DISCONNECT BALLASTS $92 $150 Implemented
ND0282 # 12 Y:1997 12 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $72 $50 Implemented
GT0624 # 01 Y:1997 01 1997 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,995 $4,380 Implemented
GT0624 # 02 Y:1997 02 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,420 $900 Implemented
GT0624 # 03 Y:1997 03 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $1,480 $150 Implemented
GT0624 # 04 Y:1997 04 1997 UPGRADE CONTROLS ON COMPRESSORS $2,470 $0 Not Implemented
GT0624 # 05 Y:1997 05 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $80 $250 Not Implemented
GT0624 # 06 Y:1997 06 1997 CONVERT TO ELECTROSTATIC POWDER COATING $6,540 $0 Not Implemented
GT0624 # 07 Y:1997 07 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $1,600 $1,320 Not Implemented
GT0624 # 08 Y:1997 08 1997 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $18,900 $4,000 Not Implemented
NC0119 # 01 Y:1997 01 1997 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,540 $9,360 Not Implemented
NC0119 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $832 $180 Implemented
NC0119 # 03 Y:1997 03 1997 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,719 $5,750 Implemented
NC0119 # 04 Y:1997 04 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,369 $0 Not Implemented
NC0119 # 05 Y:1997 05 1997 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,047 $43,046 Not Implemented
NC0119 # 06 Y:1997 06 1997 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,220 $45,000 Not Implemented
NC0119 # 07 Y:1997 07 1997 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $8,808 $39,078 Not Implemented
NC0119 # 08 Y:1997 08 1997 REDUCE SCRAP PRODUCTION $13,896 $15,000 Implemented
NC0119 # 09 Y:1997 09 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,671 $26,025 Not Implemented