IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,257

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0105 # 04 Y:1996 04 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,194 $1,520 Not Implemented
NC0105 # 05 Y:1996 05 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,174 $11,500 Not Implemented
NC0105 # 06 Y:1996 06 1996 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,508 $3,000 Implemented
NC0105 # 07 Y:1996 07 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,655 $5,125 Not Implemented
NC0105 # 08 Y:1996 08 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,562 $5,464 Not Implemented
NC0105 # 09 Y:1996 09 1996 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $702 $500 Not Implemented
NC0105 # 10 Y:1996 10 1996 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $826 $500 Not Implemented
NC0105 # 11 Y:1996 11 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $225 $200 Not Implemented
OD0073 # 01 Y:1996 01 1996 INSTALL TIMERS AND/OR THERMOSTATS $7,046 $60 Not Implemented
OD0073 # 02 Y:1996 02 1996 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,217 $1,860 Not Implemented
OD0073 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,956 $6,885 Not Implemented
OD0073 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,834 $400 Not Implemented
OD0073 # 05 Y:1996 05 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $5,723 $20,400 Implemented
OD0073 # 06 Y:1996 06 1996 BURN WASTE OIL FOR HEAT $2,167 $2,920 Not Implemented
OD0073 # 07 Y:1996 07 1996 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $12,085 $15,400 Not Implemented
WI0283 # 01 Y:1996 01 1996 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $9,545 $500 Implemented
WI0283 # 02 Y:1996 02 1996 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $5,710 $500 Implemented
WI0283 # 03 Y:1996 03 1996 USE A DIFFERENT OR RECYCLED RAW MATERIAL $5,530 $0 Not Implemented
WI0283 # 04 Y:1996 04 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $4,200 $500 Implemented
WI0283 # 05 Y:1996 05 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,835 $0 Not Implemented
WI0283 # 06 Y:1996 06 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,005 $608 Implemented
WI0283 # 07 Y:1996 07 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $674 $240 Implemented
WI0283 # 08 Y:1996 08 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $431 $640 Not Implemented
WI0283 # 09 Y:1996 09 1996 COMBINE UTILITY METERS $567 $1,000 Not Implemented
WI0283 # 10 Y:1996 10 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $539 $3,500 Not Implemented