IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

83

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0577 # 06 Y:2022 06 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,972 $0 Implemented
UF0577 # 08 Y:2022 08 2022 INSTALL OCCUPANCY SENSORS $1,187 $4,373 Not Implemented
UF0577 # 11 Y:2022 11 2022 RECOVER AND REUSE WASTE MATERIAL $28,657 $31,000 Implemented
UF0577 # 02 Y:2022 02 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,407 $2,618 Implemented
UF0577 # 09 Y:2022 09 2022 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,049 $200 Implemented
UF0577 # 07 Y:2022 07 2022 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,440 $3,987 Not Implemented
UF0577 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,354 $640 Implemented
UF0577 # 03 Y:2022 03 2022 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,363 $0 Implemented
UF0577 # 10 Y:2022 10 2022 SCHEDULE DELIVERIES ACCORDING TO DEMAND $3,120 $2,528 Implemented
UF0577 # 04 Y:2022 04 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,190 $15,730 Not Implemented
UF0577 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,991 $304 Implemented
UF0562 # 06 Y:2020 06 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,545 $1,778 Implemented
UF0562 # 04 Y:2020 04 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,128 $7,733 Not Implemented
UF0562 # 07 Y:2020 07 2020 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,484 $2,380 Not Implemented
UF0562 # 08 Y:2020 08 2020 USE PHOTOCELL CONTROLS $904 $0 Implemented
UF0562 # 03 Y:2020 03 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,271 $0 Implemented
UF0562 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $2,645 $4,780 Implemented
UF0562 # 02 Y:2020 02 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,635 $4,086 Implemented
UF0562 # 01 Y:2020 01 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $30,571 $24,600 Not Implemented
MI0347 # 11 Y:2019 11 2019 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,617 $1,707 Implemented
MI0347 # 10 Y:2019 10 2019 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,492 $7,000 Not Implemented
MI0347 # 09 Y:2019 09 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,469 $1,640 Not Implemented
MI0347 # 08 Y:2019 08 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,489 $5,529 Implemented
MI0347 # 06 Y:2019 06 2019 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,152 $10,680 Not Implemented
MI0347 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,740 $2,923 Implemented