IAC logo
IAC Assessment: UF0577
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0577
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2022
Principal Product Water Pumps
NAICS 333996 - Fluid Power Pump and Motor Manufacturing
SIC 3561 - Pumps And Pumping Equipment
Sales $10,000,000-$50,000,000
# of Employees 15
Plant Area (Sq.Ft.) 466,864
Annual Production 4,754 Units
Production Hrs. Annual 2,080
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $26,828 486,533 kWh $0.06
Electricity Demand $21,912 2,003 kW-months/year $10.94
Electricity Fees $10,768 - $ -
Natural Gas $1,071 120 MMBtu $8.95
LPG $7,351 209 MMBtu $35.12
Fuel Oil #1 $33,633 1,806 MMBtu $18.62
TOTAL ENERGY COSTS $117,163
RECOMMENDED SAVINGS* $54,730 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,913
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #1 Solid Waste (non-haz) Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Fuel Oil #1 Solid Waste (non-haz) Ancillary Material Cost By-product Production
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$5,354
Cost:
$640
$2,739 49,804 $2,615 239 - - - - - - - - $2,739
49,804
kWh
$2,615
239
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$3,407
Cost:
$2,618
$1,873 34,057 $1,534 140 - - - - - - - - $1,873
34,057
kWh
$1,534
140
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$3,363
Cost:
-
- - - - $3,363 181 - - - - - - -
-
kWh
-
-
kW-months/year
$3,363
181
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$3,190
Cost:
$15,730
$1,632 29,679 $1,558 142 - - - - - - - - $1,632
29,679
kWh
$1,558
142
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,991
Cost:
$304
$1,991 36,200 - - - - - - - - - - $1,991
36,200
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,972
Cost:
-
$1,972 35,862 - - - - - - - - - - $1,972
35,862
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$1,440
Cost:
$3,987
$802 14,580 $638 58 - - - - - - - - $802
14,580
kWh
$638
58
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,187
Cost:
$4,373
$1,187 21,577 - - - - - - - - - - $1,187
21,577
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
09: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$1,049
Cost:
$200
$1,049 19,078 - - - - - - - - - - $1,049
19,078
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
10: 4.311 SCHEDULE DELIVERIES ACCORDING TO DEMAND Savings:
$3,120
Cost:
$2,528
- - - - - - - - $3,120 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$3,120
-
$
-
-
$
11: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$28,657
Cost:
$31,000
$(-386) (-7,020) $(-5,907) (-540) - - $15,600 915,931 - - $19,349 - $(-386)
(-7,020)
kWh
$(-5,907)
(-540)
kW-months/year
-
-
MMBtu
$15,600
915,931
lb
-
-
$
$19,349
-
$
TOTAL RECOMMENDED Savings:
$54,730
Cost:
$61,380
$12,859 233,817 $439 40 $3,363 181 $15,600 915,931 $3,120 - $19,349 - $12,859
233,817
kWh
$439
40
kW-months/year
$3,363
181
MMBtu
$15,600
915,931
lb
$3,120
-
$
$19,349
-
$
TOTAL IMPLEMENTED Savings:
$48,913
Cost:
$37,290
$9,238 167,981 $(-1,757) (-161) $3,363 181 $15,600 915,931 $3,120 - $19,349 - $9,238
167,981
kWh
$(-1,757)
(-161)
kW-months/year
$3,363
181
MMBtu
$15,600
915,931
lb
$3,120
-
$
$19,349
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Fuel Oil #1 Solid Waste (non-haz) Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Fuel Oil #1 Solid Waste (non-haz) Ancillary Material Cost By-product Production