IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0344 # 06 Y:1995 06 1995 REDUCE VENTILATION AIR $344 $0 Implemented
MA0344 # 10 Y:1995 10 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,920 $0 Not Implemented
MA0344 # 08 Y:1995 08 1995 CONVERT TO ELECTROSTATIC POWDER COATING $16,229 $4,500 Not Implemented
MA0344 # 07 Y:1995 07 1995 USE LESS WASTEFUL PACKAGING $22,500 $0 Not Implemented
MA0344 # 05 Y:1995 05 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $598 $0 Not Implemented
MA0344 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,098 $798 Implemented
MA0344 # 03 Y:1995 03 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,909 $0 Implemented
MA0344 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,398 $24,197 Not Implemented
MA0344 # 01 Y:1995 01 1995 INSTALL TIMERS AND/OR THERMOSTATS $6,107 $2,446 Not Implemented
MA0344 # 09 Y:1995 09 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $11,867 $5,000 Not Implemented
MA0292 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,732 $20,860 Not Implemented
MA0292 # 09 Y:1994 09 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $327 $961 Implemented
MA0292 # 08 Y:1994 08 1994 INSTALL OCCUPANCY SENSORS $400 $416 Not Implemented
MA0292 # 07 Y:1994 07 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $503 $300 Implemented
MA0292 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $939 $100 Implemented
MA0292 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,012 $1,062 Implemented
MA0292 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,154 $0 Implemented
MA0292 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $9,713 $22,395 Not Implemented
MA0292 # 01 Y:1994 01 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,627 $0 Not Implemented
MA0147 # 06 Y:1989 06 1989 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,080 $0 Implemented
MA0147 # 05 Y:1989 05 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $446 $331 Implemented
MA0147 # 04 Y:1989 04 1989 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $3,136 $483 Not Implemented
MA0147 # 03 Y:1989 03 1989 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $144 $41 Implemented
MA0147 # 02 Y:1989 02 1989 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $182,460 $350,000 Not Implemented
MA0147 # 01 Y:1989 01 1989 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $9,019 $15,500 Not Implemented