Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
39
matching recommendationsSIC | 356 | General Industrial Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0156 # 02 Y:1989 | 02 | 1989 | REVISE SMOKE CLEANUP FROM OPERATIONS | $1,120 | $3,500 | Not Implemented |
CO0156 # 01 Y:1989 | 01 | 1989 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,970 | $250 | Implemented |
CO0156 # 10 Y:1989 | 10 | 1989 | INSULATE BARE EQUIPMENT | $660 | $500 | Not Implemented |
CO0156 # 09 Y:1989 | 09 | 1989 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,131 | $5,000 | Not Implemented |
CO0156 # 08 Y:1989 | 08 | 1989 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,470 | $1,800 | Not Implemented |
CO0156 # 07 Y:1989 | 07 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $635 | $2,480 | Implemented |
CO0156 # 06 Y:1989 | 06 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $277 | $105 | Implemented |
CO0156 # 05 Y:1989 | 05 | 1989 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,240 | $800 | Implemented |
CO0156 # 04 Y:1989 | 04 | 1989 | INSTALL TIMERS AND/OR THERMOSTATS | $4,640 | $1,500 | Implemented |
CO0156 # 03 Y:1989 | 03 | 1989 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,480 | $1,200 | Implemented |
UD0291 # 04 Y:1989 | 04 | 1989 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $2,237 | $4,000 | Not Implemented |
UD0291 # 03 Y:1989 | 03 | 1989 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $851 | $500 | Implemented |
UD0291 # 01 Y:1989 | 01 | 1989 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,548 | $6,000 | Not Implemented |
MA0151 # 07 Y:1989 | 07 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,050 | $3,150 | Not Implemented |
MA0151 # 06 Y:1989 | 06 | 1989 | USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC | $1,093 | $592 | Not Implemented |
MA0151 # 05 Y:1989 | 05 | 1989 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $1,022 | $593 | Implemented |
MA0151 # 04 Y:1989 | 04 | 1989 | BURN A LESS EXPENSIVE GRADE OF FUEL | $12,509 | $15,150 | Implemented |
MA0151 # 03 Y:1989 | 03 | 1989 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $4,308 | $243 | Not Implemented |
MA0151 # 02 Y:1989 | 02 | 1989 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,218 | $305 | Not Implemented |
MA0151 # 01 Y:1989 | 01 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,228 | $426 | Not Implemented |
UD0291 # 02 Y:1989 | 02 | 1989 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,832 | $15,000 | Implemented |
UD0291 # 05 Y:1989 | 05 | 1989 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,866 | $2,000 | Implemented |
MA0147 # 06 Y:1989 | 06 | 1989 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,080 | $0 | Implemented |
MA0147 # 03 Y:1989 | 03 | 1989 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $144 | $41 | Implemented |
MA0147 # 02 Y:1989 | 02 | 1989 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $182,460 | $350,000 | Not Implemented |