IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

96

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0526 # 05 Y:1999 05 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $52,280 $151,000 Not Implemented
KU0526 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $700 $1,050 Not Implemented
KU0526 # 03 Y:1999 03 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $1,000 $0 Not Implemented
KU0526 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,600 $810 Not Implemented
KU0526 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,050 $10,000 Not Implemented
UL0228 # 03 Y:1999 03 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $9,641 $10,400 Not Implemented
UL0228 # 05 Y:1999 05 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $88,740 $1,560 Not Implemented
UL0228 # 06 Y:1999 06 1999 SCHEDULE DELIVERIES ACCORDING TO DEMAND $250,000 $0 Not Implemented
UL0228 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,001 $20 Implemented
UL0228 # 02 Y:1999 02 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $8,550 $0 Not Implemented
UL0228 # 04 Y:1999 04 1999 USE LESS WASTEFUL PACKAGING $58,958 $1,000 Not Implemented
ND0329 # 10 Y:1999 10 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $181 $390 Implemented
ND0329 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $720 $7,006 Not Implemented
ND0329 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,236 $1,500 Not Implemented
ND0329 # 07 Y:1999 07 1999 MINIMIZE WATER USAGE $878 $2,300 Not Implemented
ND0329 # 03 Y:1999 03 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,442 $5,000 Not Implemented
ND0329 # 01 Y:1999 01 1999 CLEAR AND RENT EXISTING SPACE $40,000 $18,000 Implemented
ND0329 # 05 Y:1999 05 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,296 $300 Not Implemented
ND0329 # 08 Y:1999 08 1999 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $658 $250 Not Implemented
ND0329 # 06 Y:1999 06 1999 MINIMIZE WATER USAGE $870 $1,400 Not Implemented
ND0329 # 09 Y:1999 09 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $587 $100 Implemented
MS0138 # 08 Y:1999 08 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $18,055 $720 Implemented
MS0138 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,777 $1,994 Implemented
MS0138 # 02 Y:1999 02 1999 SHUT OFF PILOTS IN STANDBY EQUIPMENT $884 $80 Implemented
MS0138 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,462 $266 Implemented