Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
60
matching recommendationsSIC | 356 | General Industrial Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0480 # 02 Y:2000 | 02 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,190 | $10,000 | Not Implemented |
MA0480 # 01 Y:2000 | 01 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $63,120 | $282,000 | Not Implemented |
MA0480 # 03 Y:2000 | 03 | 2000 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $4,330 | $8,000 | Implemented |
MA0480 # 12 Y:2000 | 12 | 2000 | INSTALL OCCUPANCY SENSORS | $12,215 | $1,000 | Implemented |
MA0480 # 04 Y:2000 | 04 | 2000 | AIR CONDITION ONLY SPACE NECESSARY | $10,600 | $5,000 | Implemented |
MA0480 # 08 Y:2000 | 08 | 2000 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $8,620 | $2,000 | Implemented |
MA0480 # 10 Y:2000 | 10 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,660 | $5,000 | Implemented |
MA0480 # 11 Y:2000 | 11 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,020 | $0 | Implemented |
MA0480 # 09 Y:2000 | 09 | 2000 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $930 | $0 | Implemented |
MA0480 # 05 Y:2000 | 05 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,290 | $9,000 | Not Implemented |
MA0480 # 06 Y:2000 | 06 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,290 | $6,500 | Not Implemented |
MA0480 # 07 Y:2000 | 07 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,450 | $27,000 | Implemented |
WV0204 # 15 Y:2000 | 15 | 2000 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $72,800 | $140,000 | Not Implemented |
WV0204 # 04 Y:2000 | 04 | 2000 | INSTALL SPECTRAL REFLECTORS / DELAMP | $658 | $1,088 | Implemented |
WV0204 # 12 Y:2000 | 12 | 2000 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $1,902 | $5,604 | Not Implemented |
WV0204 # 11 Y:2000 | 11 | 2000 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,992 | $34 | Not Implemented |
WV0204 # 10 Y:2000 | 10 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $705 | $75 | Implemented |
WV0204 # 09 Y:2000 | 09 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,607 | $680 | Implemented |
WV0204 # 08 Y:2000 | 08 | 2000 | ISOLATE HOT OR COLD EQUIPMENT | $996 | $1,500 | Not Implemented |
WV0204 # 07 Y:2000 | 07 | 2000 | USE SYNTHETIC LUBRICANT | $656 | $334 | Implemented |
WV0204 # 13 Y:2000 | 13 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,081 | $5,000 | Not Implemented |
WV0204 # 01 Y:2000 | 01 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,706 | $268 | Not Implemented |
WV0204 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $503 | $40 | Implemented |
WV0204 # 05 Y:2000 | 05 | 2000 | INSULATE BARE EQUIPMENT | $12,395 | $2,180 | Implemented |
WV0204 # 06 Y:2000 | 06 | 2000 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,627 | $680 | Implemented |