Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
60
matching recommendationsSIC | 356 | General Industrial Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0480 # 02 Y:2000 | 02 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,190 | $10,000 | Not Implemented |
MA0480 # 01 Y:2000 | 01 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $63,120 | $282,000 | Not Implemented |
MA0480 # 12 Y:2000 | 12 | 2000 | INSTALL OCCUPANCY SENSORS | $12,215 | $1,000 | Implemented |
MA0480 # 11 Y:2000 | 11 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,020 | $0 | Implemented |
MA0480 # 10 Y:2000 | 10 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,660 | $5,000 | Implemented |
MA0480 # 09 Y:2000 | 09 | 2000 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $930 | $0 | Implemented |
MA0480 # 08 Y:2000 | 08 | 2000 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $8,620 | $2,000 | Implemented |
MA0480 # 07 Y:2000 | 07 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,450 | $27,000 | Implemented |
MA0480 # 06 Y:2000 | 06 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,290 | $6,500 | Not Implemented |
MA0480 # 05 Y:2000 | 05 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,290 | $9,000 | Not Implemented |
MA0480 # 04 Y:2000 | 04 | 2000 | AIR CONDITION ONLY SPACE NECESSARY | $10,600 | $5,000 | Implemented |
MA0480 # 03 Y:2000 | 03 | 2000 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $4,330 | $8,000 | Implemented |
WV0204 # 05 Y:2000 | 05 | 2000 | INSULATE BARE EQUIPMENT | $12,395 | $2,180 | Implemented |
WV0204 # 04 Y:2000 | 04 | 2000 | INSTALL SPECTRAL REFLECTORS / DELAMP | $658 | $1,088 | Implemented |
WV0204 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $503 | $40 | Implemented |
WV0204 # 02 Y:2000 | 02 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,068 | $17 | Implemented |
WV0204 # 01 Y:2000 | 01 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,706 | $268 | Not Implemented |
WV0204 # 06 Y:2000 | 06 | 2000 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,627 | $680 | Implemented |
WV0204 # 07 Y:2000 | 07 | 2000 | USE SYNTHETIC LUBRICANT | $656 | $334 | Implemented |
WV0204 # 10 Y:2000 | 10 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $705 | $75 | Implemented |
WV0204 # 11 Y:2000 | 11 | 2000 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,992 | $34 | Not Implemented |
WV0204 # 08 Y:2000 | 08 | 2000 | ISOLATE HOT OR COLD EQUIPMENT | $996 | $1,500 | Not Implemented |
WV0204 # 09 Y:2000 | 09 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,607 | $680 | Implemented |
WV0204 # 12 Y:2000 | 12 | 2000 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $1,902 | $5,604 | Not Implemented |
WV0204 # 13 Y:2000 | 13 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,081 | $5,000 | Not Implemented |