IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

112

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0037 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,586 $230 Not Implemented
UU0037 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,174 $20 Not Implemented
UU0037 # 03 Y:2002 03 2002 OPTIMIZE PLANT POWER FACTOR $1,896 $2,861 Not Implemented
UU0037 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $675 $420 Not Implemented
UU0037 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,120 $0 Not Implemented
AM0422 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,545 $30 Implemented
AM0422 # 01 Y:2002 01 2002 AUTOMATE FINISHING PROCESS $47,350 $110,240 Not Implemented
AM0422 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $345 $310 Implemented
AM0422 # 08 Y:2002 08 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $140 $50 Implemented
AM0422 # 06 Y:2002 06 2002 OPTIMIZE PLANT POWER FACTOR $375 $840 Not Implemented
AM0422 # 05 Y:2002 05 2002 PAY UTILITY BILLS ON TIME $645 $0 Implemented
AM0422 # 02 Y:2002 02 2002 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $13,580 $5,270 Implemented
AM0422 # 04 Y:2002 04 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $780 $50 Implemented
MS0215 # 04 Y:2002 04 2002 INSTALL TIMERS AND/OR THERMOSTATS $500 $708 Implemented
MS0215 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,018 $151 Not Implemented
MS0215 # 02 Y:2002 02 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,672 $1,484 Not Implemented
MS0215 # 01 Y:2002 01 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,023 $50 Implemented
GT0744 # 01 Y:2002 01 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $861 $0 Not Implemented
GT0744 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $4,070 $5,050 Not Implemented
GT0744 # 04 Y:2002 04 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $65,772 $108,000 Not Implemented
GT0744 # 05 Y:2002 05 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $22,535 $41,250 Implemented
GT0744 # 07 Y:2002 07 2002 MODIFY WORKLOAD $27,000 $4,600 Implemented
GT0744 # 02 Y:2002 02 2002 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $13,835 $0 Not Implemented
GT0744 # 06 Y:2002 06 2002 DISCONNECT BALLASTS $2,743 $1,200 Not Implemented
WI0428 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,687 $0 Not Implemented